Entry  Friday, May 10, 2013, 11:02, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 with no target and no source tray has been moved from the south hot cell to the conditioning station.
Entry  Friday, May 10, 2013, 09:26, chad fisher, South Hot-Cell, Repair, TM3, , Containment box reinstalled IMG_1062[1].JPGIMG_1063[1].JPG
the containment box has been reinstalled onto TM3. After electrical checks it is ready to move to the conditioning station...for electrical tests.
Entry  Thursday, May 09, 2013, 14:23, chad fisher, South Hot-Cell, Repair, TM3, , Water Block Jig Removal IMG_1059[1].JPG
The source tray side of the water block jig has been removed in preparation for moving the module to the  conditioning station for electrical tests.
Entry  Thursday, May 09, 2013, 10:13, chad fisher, South Hot-Cell, Development, , , Mock-up Progress IMG_1056[1].JPGIMG_1057[1].JPGIMG_1058[1].JPG
The source tray for the mock-up has been setup for waterline bending and soldering/brazing.
Thanks to Travis for finding the photos for the TM3 rebuild that took place in the anteroom in 09' and Maico and Dan for the support in ironing
the issues with the source tray side soldering issues.
Entry  Wednesday, May 08, 2013, 13:48, chad fisher, South Hot-Cell, Repair, TM3, , IMG wiring check 
Checks of the wiring for the IMG are complete and have passed.
Entry  Wednesday, May 08, 2013, 10:12, chad fisher, South Hot-Cell, Repair, TM3, , TM3 9 pin wiring removal IMG_1055[1].JPG
The 9 pin wiring has successfully been removed from TM3.
Entry  Tuesday, May 07, 2013, 12:07, David Wang, ITW, Standard Operation, TM1, , I moved 5 shielding blocks from ITE to ITW. 
Water interlock check  on ITW is done. All water signals are strong on EL panel.  ITW is configured to take proton beam.
Entry  Monday, May 06, 2013, 15:45, Bevan Moss, Conditioning Station, Repair, TM3, , 55 pin connector removed 20130506_55_pin_conector_removal_IMG_3530.JPG20130506_55_pin_conector_removal_IMG_3525.JPG20130506_55_pin_conector_removal_IMG_3532.JPG20130506_55_pin_conector_removal_IMG_3535.JPG
Travis and I removed the 55 pin connector from the service cap today. The feed through was left in place as a new design for the replacement has yet
to be designed. It was not possible to test if the cables could be pulled easily as I believe there is still 1 cable tie in the containment box. The wires
were cut flush with the top of the copper tube in case Chad cannot remove them via the hot cell. Other items removed include several cable ties and a clamp
Entry  Friday, May 03, 2013, 09:53, chad fisher, South Hot-Cell, Repair, TM3, , 9 pin connector wiring IMG_1047[1].JPGIMG_1048[1].JPGIMG_1050[1].JPG
With the aid of nic new manipulator snap fingers made by Maico the peek cable ties restraining the 9 pin connector wiring to the gas lines have been
cut.
Entry  Thursday, May 02, 2013, 10:09, chad fisher, South Hot-Cell, Repair, TM3, , Service tray water block leak check 
David and I preformed a helium leak check on the service tray waterblocks and verify that no damage had been done during jig installation. All 14 circuits
were checked and verified to be ok except circuit E and circuit I which were unstable when helium was applied. The resonse time on E and I would suggest
that it is an issue with the bungs that were used and not the braze joint however.
Entry  Tuesday, April 30, 2013, 07:51, chad fisher, South Hot-Cell, Repair, TM3, , Coil line flow check 
David and I checked circuits p and q (the water cooled coil ciruit) for flow this morning as, with the source tray still in the module, there was both
a leak and a leak tight blockage. Both p and q allowed air flow through them confirming that the blockage was in the surce tray side of the system.
The heat shield circuit was also tested for flow and it passed.
Entry  Tuesday, April 30, 2013, 07:47, chad fisher, South Hot-Cell, Repair, TM3, , TM3 Source Tray Removal IMG_1043[1].JPG
The source tray has sucessfully been removed from TM3.
I will put a report in the TM3 rev 3 docushare directory as there were some items of note during this procedure.
Entry  Monday, April 29, 2013, 15:58, Bevan Moss, South Hot-Cell, Repair, TM3, , Source Tray Removal 20130429_TM3_SOURCE_TRAY_REMOVAL_IMG_0620.JPG
Chad removed the source tray from TM3  today, see attached picture (video was also taken). There was some interference between the window cooling
lines and the frame work as well as the clamps for the ground electrode and the water block alignment jig. There was also interference between the optics
alignment post (specifically the mushroom top) and the water block alignment jig. Investigation into these inferences needs to be completed as they could
Entry  Friday, April 26, 2013, 14:31, chad fisher, South Hot-Cell, Repair, TM3, , TM3 refurb E.O.D. IMG_1039.JPG
Service tray side of the waterblock jig is installed and all locking tabs enagaed save the heat shield circuit. Locking tab for heat shield circuit with
be worked on Monday morning and installation of the source tray side of the waterblock jig should commence on monday as well.
Entry  Friday, April 26, 2013, 11:20, chad fisher, South Hot-Cell, Repair, TM3, , Water Block Jig (back half) 
The back half of the water block jig (services tray side) has been sucessfully located onto the module.
About 50% of the waterblocks have centered themselfs it their respective cups and the rest look good for concentricity but will require some gentle
wiggling to get them to seat.
Entry  Wednesday, April 24, 2013, 14:09, chad fisher, South Hot-Cell, Repair, TM3, , TM3 Refurbishment E.O.D.  
Optics tray has been removed from module.
Waterblock jig installation has commenced. Of note, jig installation on TM3 has proven more dificult than the previous installation on TM2. Many
of the waterblock assemblies are skewed (not perpendicular to plane that they should be...perpendicular to).
Entry  Wednesday, April 24, 2013, 11:48, chad fisher, South Hot-Cell, Repair, TM3, , TM3 Source Tray Removal 
Work on TM3 source tray removal started at 10:40 am today.
The containment box has been removed, and disconnection of the optics tray is 90 complete.
 
Entry  Wednesday, April 24, 2013, 10:36, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 
The F-308's have been serviced and are ready to be filled. All inspection records are stored  in docushare.
https://documents.triumf.ca/docushare/dsweb/View/Collection-1085
Entry  Wednesday, April 24, 2013, 10:14, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 has been moved from the conditioning station to the south hot cell, move went well.
Entry  Wednesday, April 24, 2013, 09:00, Bevan Moss, Conditioning Station, Development, , , New user testing 
 Controls has created a new user group that can operate the conditioning station but cannot use any of the bypasses or forces. The cooling package
will be used to test this new profile. The main loop bypass has been opened to allow this testing to happen without the risk of over pressure.