ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
795
|
Wednesday, November 19, 2014, 11:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | | CS roughing pump is started. | CS roughing pump is started for TM4 and
UCX 11 target. |
|
798
|
Thursday, November 20, 2014, 14:13 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx11 | CS and TM4 was vented with Argon gas | CS and TM4 was vented with Argon gas this
morning before it was moved from CS to ITE. |
|
809
|
Thursday, December 04, 2014, 09:49 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the south hot
cell to the conditioning station. |
|
812
|
Thursday, December 04, 2014, 16:37 |
David Wang | Conditioning Station | Development | TM2 | | connected TM2 and CS vacuum system . | I connected TM2 and CS vacuum system. All
vacuum pumps on TM2 and CS are started .The
pumping down is good so .far |
|
813
|
Friday, December 05, 2014, 07:47 |
David Wang | Conditioning Station | Development | TM2 | | TM2 at CS | The pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec |
|
814
|
Friday, December 05, 2014, 11:58 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D) water lines. | At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied |
6x |
815
|
Friday, December 05, 2014, 13:46 |
Anders Mjos | Conditioning Station | Development | TM2 | | Not able to start water system | TCS:WPV1 does not open when staging
is enabled. Multiple attempts have been made,
but the valve remains closed. |
|
816
|
Friday, December 05, 2014, 15:41 |
Anders Mjos | Conditioning Station | Development | TM2 | | RGA results | Measurement taken at 14:25. IG2 at ~7.7E-6
T |
|
817
|
Monday, December 08, 2014, 13:52 |
Anders Mjos | Conditioning Station | Development | TM2 | | Fixed - Not able to start water system |
|
|
818
|
Monday, December 08, 2014, 15:22 |
Anders Mjos | Conditioning Station | Development | TM2 | | Circuit D water test | Monday, December 08, 2014, 14:00: Dan M
and Anders connected the water supply to
circuit D and installed the module cover. |
|
819
|
Monday, December 15, 2014, 08:50 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TK2 level below 15 in (secondary loop) | The level dropped below 15 in over
the weekend. MP2 stopped, but MP3 condtinued
pumping. |
|
820
|
Monday, December 15, 2014, 09:41 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | Water leak found at the isolation transforer |
|
|
821
|
Monday, December 15, 2014, 12:53 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TCSTK2 topped up |
|
|
822
|
Monday, December 15, 2014, 13:25 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | BIASSW1 temperature and flow removed from interlock chain |
|
|
823
|
Monday, December 15, 2014, 15:55 |
Grant Minor | Conditioning Station | Repair | | | Access to ISAC TCS TK2 Expansion Tank - Fall Arrest | Hello all,
Access was required this morning to |
|
824
|
Tuesday, December 23, 2014, 14:10 |
Anders Mjos | Conditioning Station | Development | TM2 | | He leak check of the Service Cap using RGA | The RGA showed no response to He-spray
on the Service Cap. He stable at 3.5E-9 T
partial pressure, water at 1.3E-6 T. IG1 |
|
825
|
Monday, January 05, 2015, 12:47 |
Anders Mjos | Conditioning Station | Development | TM2 | | Cooling package started | by "enable staging" button.
MP3 has to be turned off-on to open WPV1 |
|
826
|
Monday, January 05, 2015, 15:01 |
Anders Mjos | Conditioning Station | Development | TM2 | | RGA switched on | |
|
828
|
Tuesday, January 06, 2015, 11:21 |
Anders Mjos | Conditioning Station | Development | TM2 | | He leak check of cooling circuits. | No leak detected on either He-detector
(connected directly to Service Cap) or on
RGA. See attached screen shots. |
|
829
|
Wednesday, January 07, 2015, 09:31 |
Anders Mjos | Conditioning Station | Development | TM2 | | High Voltage Conditioning | No Source Tray installed. Loop on cooling
circuit D. All other circuits blanked off.
Voltages stated below are set point |
|