Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
|
|
Monday, December 15, 2014, 08:50, Anders Mjos, Conditioning Station, Maintenance, TM2, , TK2 level below 15 in (secondary loop)
|
Monday, December 15, 2014, 09:41, Anders Mjos, Conditioning Station, Maintenance, TM2, , Water leak found at the isolation transforer
|
Monday, December 15, 2014, 12:53, Anders Mjos, Conditioning Station, Maintenance, TM2, , TCSTK2 topped up
|
Monday, December 15, 2014, 13:25, Anders Mjos, Conditioning Station, Maintenance, TM2, , BIASSW1 temperature and flow removed from interlock chain
|
|
Message ID: 819
Entry time: Monday, December 15, 2014, 08:50
Reply to this: 820
|
Author: |
Anders Mjos |
Category: |
Conditioning Station |
Type: |
Maintenance |
Module: |
TM2 |
Target/Number: |
|
Subject: |
TK2 level below 15 in (secondary loop) |
|
|
The level dropped below 15 in over the weekend. MP2 stopped, but MP3 condtinued pumping. |