Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 812     Entry time: Thursday, December 04, 2014, 16:37
Author: David Wang 
Category: Conditioning Station 
Type: Development 
Module: TM2 
Target/Number:  
Subject: connected TM2 and CS vacuum system . 

I connected TM2 and CS vacuum system. All vacuum pumps on TM2 and CS are started .The pumping down is good so .far

ELOG V2.9.2-2455