Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 795     Entry time: Wednesday, November 19, 2014, 11:12
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: CS roughing pump is started.  

CS roughing pump is started for TM4 and UCX 11 target.

ELOG V2.9.2-2455