ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  2575   Wednesday, May 01, 2024, 09:50 David WangITWStandard OperationTM4 TM4 has been connected to ITW.TM4 has been connected to ITW. see attachment.  Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf 
  2576   Wednesday, May 01, 2024, 14:51 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved form TCS to SHC.Travis and I moved TM3 from TCS to SHC
this afternoon. The move is smooth. 
  
  2577   Thursday, May 02, 2024, 09:00 David WangITWStandard OperationTM4 Annual ITW water signal interlock check has been done. Annual ITW water signal interlock check
has been done. Renee helped me on it. Everything
works fine. 
  
  2578   Thursday, May 02, 2024, 14:54 David WangConditioning StationStandard OperationTM3UCx#44TM3 has been moved from SHC to TCS.TM3 has been moved  from SHC to TCS
by David and Frank. The move is smooth. 
  
  2579   Thursday, May 02, 2024, 14:58 David WangSouth Hot-CellStandard OperationTM3UCx#44TM3 with UCx#44 electrical check and leak check.TM3 with UCx#44 electrical check and leak
check are good. see attachment.
HS line 70 psi helium pressure test
 Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf 
  2580   Thursday, May 02, 2024, 15:23 David WangSouth Hot-CellDevelopmentTM3 Leak check on TM3 new containment box window line VCR fittings. After new containment box installation
on TM3, Chad and I did a helium spray leak
check on two VCR fittings on front side water
  
  2583   Tuesday, May 07, 2024, 09:47 David WangITE/ITWMaintenanceTM2 Broken TM2:TP2 has been replaced. Broken TM2:TP2 has been replaced otday
by a new TV-1001 nav pump supplied by vacuum
group. replaced pump seris number:201281.
  
  2585   Wednesday, May 08, 2024, 12:36 David WangConditioning StationStandard OperationTM3UCx#44TCS was argon vented this morning between 7:00 to 8:30 am.TCS was argon vented this morning between
7:00 to 8:30 am before module was moved to
ITE.
  
  2586   Wednesday, May 08, 2024, 12:37 David WangITEStandard OperationTM3UCx#44Tm3 has been moved form TCS to ITEThe move is smooth and successful.   
  2589   Friday, May 10, 2024, 09:04 David WangITEStandard OperationTM3UCx#44Tm3 has been connected in ITE. Tm3 has been connected in ITE.  see
attachment.
 Scanned_from_a_Xerox_Multifunction_Printer.pdf 
  2590   Monday, May 13, 2024, 09:28 David WangITEStandard OperationTM4UCx#44ITE water signal annual interlock check.ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. 
  
  2593   Tuesday, May 21, 2024, 09:50 David WangITWStandard OperationTM4Lp Febiad emptyTm4 has been disconnected in ITW.Tm4 has been disconnected in ITW per document
141576. Checklist is done.  HS line
is purged.
 TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf 
  2594   Tuesday, May 21, 2024, 11:46 David WangITWStandard OperationTM4LP febiad empty. Tm4 has been moved from ITW to SHC.Tm4 has been moved from ITW to SHC. the
move is smooth. 
  
  2595   Wednesday, May 22, 2024, 12:32 David WangSouth Hot-CellStandard OperationTM4UCx#45TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. the
move is smooth. 
  
  2596   Wednesday, May 22, 2024, 12:43 David WangSouth Hot-CellStandard OperationTM4UCx#45electrical check and leak check were done on TM4 UCx#45 target at SHC.electrical check and leak check were done
on TM4 UCx#45 target at SHC.  everything
is ok. See attachment
 Scanned_from_a_Xerox_Multifunction_Printer.pdf 
  2598   Thursday, May 23, 2024, 11:10 David WangMAAStandard Operation  BL2A MAA ASU test.MCR Travis Curucz and I finished BL2A MAA
ASU test per document 154779. everything
works fine. Travis kept  the test document.
  
  2600   Tuesday, May 28, 2024, 07:45 David WangConditioning StationStandard OperationTM4UCx#45TCS was argon vented this morning between 6:00 and 7:30am. TCS was argon vented this morning between
6:00 and 7:30am for TM4 moving to ITW.
  
  2601   Tuesday, May 28, 2024, 10:13 David WangITWStandard OperationTM4UCx#45Tm4 has been moved from TCS to ITW. Tm4 has been moved from TCS to ITW. 
the move is smooth. 
  
  2603   Thursday, May 30, 2024, 11:08 David WangConditioning StationStandard OperationTM2 TM2 was moved from silo to TCS yesterday morning.TM2 was moved from silo to TCS yesterday
morning. The move is smooth.   
TCS vacuum system was started after. TCS
  
  2605   Wednesday, June 05, 2024, 11:25 David WangConditioning StationStandard Operation  refilled TCS:TK2 to 27.4 inches. refilled TCS:TK2 to 27.4 inches to compensate
water lost during THC filters change. 
  