Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2579     Entry time: Thursday, May 02, 2024, 14:58
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: UCx#44 
Subject: TM3 with UCx#44 electrical check and leak check. 

TM3 with UCx#44 electrical check and leak check are good. see attachment.

HS line 70 psi helium pressure test at TCS: no leak at 0.0xe-9 torr.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf  123 kB  | Show | Hide all
ELOG V2.9.2-2455