Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2580     Entry time: Thursday, May 02, 2024, 15:23
Author: David Wang 
Category: South Hot-Cell 
Type: Development 
Module: TM3 
Target/Number:  
Subject: Leak check on TM3 new containment box window line VCR fittings.  

After new containment box installation on TM3, Chad and I did a helium spray leak check on two VCR fittings on front side water lines. they are leak free.

Helium pressurize window water line to 70 psi for 3minutes. No response on leak detector which is 0.0xe-9 atm.cc/sec.

ELOG V2.9.2-2455