Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2605
Entry time:
Wednesday, June 05, 2024, 11:25
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
Target/Number:
Subject:
refilled TCS:TK2 to 27.4 inches.
refilled TCS:TK2 to 27.4 inches to compensate water lost during THC filters change.
ELOG V2.9.2-2455