Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2594     Entry time: Tuesday, May 21, 2024, 11:46
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM4 
Target/Number: LP febiad empty.  
Subject: Tm4 has been moved from ITW to SHC. 

Tm4 has been moved from ITW to SHC. the move is smooth.

ELOG V2.9.2-2455