Entry  Thursday, July 25, 2013, 09:37, Travis Cave, Conditioning Station, Standard Operation, TM4, SiC#29, Electrical check TM#4_SiC#29_FEBIAD_TgtElecChkCS_.PDF
Electrical check of TM#4 with SiC#29 attached. Results are pretty much the same as yesterday for the coil to 60kV common, and anode to 60kV common. See
attached pdf for details.
Entry  Thursday, July 25, 2013, 10:08, David Wang, Conditioning Station, Standard Operation, TM4, SiC #29, TM4 HS helium pressure test andTM4 connection at CS 
Bevan and I did a helium pressure test on TM4 HS water circuit at CS. The leak detector is pumped to the bottom scale(E-9 atm.cc/sec and E-4torr). We
applied 70 psi helium to the HS circuit for 3 minutes .  No response had been found. I also leak checked IG1 flange which was replaced yesterday.
It is  good. We connected the TM4 to CS and put the HV cover on. The water cooling system will be started soon.
Entry  Monday, August 26, 2013, 18:26, Grant Minor, Conditioning Station, Standard Operation, TM3, , TM3 moved from Hot Cell to Conditioning Station 
Target Module 3 with no target, and a partially-installed Rev-3 source tray (no steerers connected, no IMG connected, entrance window lines blanked off
on module side and not connected to containment box) was transported successfully to the Conditioning Station by Travis Cave and David Wang at around 4pm
today.  David attached the vacuum system for start of pump-down to prepare for leak checking.
Entry  Tuesday, August 27, 2013, 17:18, Grant Minor, Conditioning Station, Repair, TM3, no target, TM3 Rev 3 source tray - prelminary leak check results at CS TM3_leak_check_at_CS_27Aug2013.JPGsketch_TM3_water_feedthru_27Aug2013-1.pdf
David Wang started a helium leak check on TM3 at the CS this morning.
David will create an e-log once his check is complete, but here are the preliminary results:
- target oven +/- OK
Entry  Wednesday, August 28, 2013, 14:25, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the conditioning station to the south hot cell. The fields observed around the containment box of the module
ranged from 0.80 mSv/hr to 1.8mSv/hr..
Entry  Thursday, August 29, 2013, 06:48, David Wang, Conditioning Station, Development, TM3, , TM3 leak check in CS with new source tray. TM3_leak_check_at_CS_2013__AUG_27th.pdf
A huge leak had been found on HS circuit during 60 psi helium pressurize test. Other circuits are free of obvious major leak at present .We will test
them again once the TM3 is back to CS. See attachment for details
Entry  Wednesday, September 11, 2013, 11:31, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved to the conditioning station from the south hot cell.
Entry  Wednesday, September 11, 2013, 13:43, David Wang, Conditioning Station, Development, TM3, , Started 3 turbo pumps on CS for TM3 
TM3 has been connected in CS.Three turbo- pumps have been started. The pumping down is fine so far.
Entry  Friday, September 13, 2013, 07:49, David Wang, Conditioning Station, Development, TM3, , TM3 water lines leak check at CS TM3_water_lines_leak_check_at_CS.pdf
I leak checked TM3 water lines at CS with 60 psi and 80psi helium. The base leak rate is 5.0xe-9 atm.cc/sec. Each circuit 3 minutes helium pressurizing
for each time test. No any respose had been found on leak detector during the test. See attachment
Entry  Wednesday, September 25, 2013, 13:48, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_CS.PDF
Electrical check of TM#3 in the conditioning station under vacuum see attached PDF for details.
Entry  Thursday, September 26, 2013, 09:46, maicodallavalle, Conditioning Station, Repair, TM3, , Leak check / Pressure Test 
TM3 has had all of the water lines pressurized with Helium and the Helium Leak detector was connected to the turbo pumps. There were no leaks detected.
    Reply  Thursday, September 26, 2013, 14:37, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, Leak check / Pressure Test 


    
        
            maicodallavalle wrote:
        
        
            
            TM3 has had all of the water lines pressurized with Helium and the Helium Leak detector was connected
Entry  Thursday, September 26, 2013, 14:47, Bevan Moss, Conditioning Station, Maintenance, TM3, NiO#2, Water pumps turned on 
 The water pumps for the conditioning station were turned on at ~11:45. It took longer to start the conditioning station as the air from the leak
test had to be bled off and the make up water tank refilled. The valves on the water supply line were closed slightly to make up for the fact the water
cooled power supply has been removed. DIF2 was installed by Maico so we can measure the flow in the primary side.
Entry  Thursday, September 26, 2013, 14:55, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, HV conditioning 26092013_TM3_NiO2_HV_conditioning_first_attempt.txt
 The first attempt at HV conditioning of TM3 with the new source tray and NiO#2 target installed. Conditioning so far has been very slow, with the
current increasing quickly to a maximum of 400uA. Voltage in these cases was lowered until the current was below 200uA. Attached is the raw data. It appears
the source tray and target are conditioning just there is either something burning off or there is localized poor vacuum.
Entry  Thursday, September 26, 2013, 15:00, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, RGA not connecting 
 Following the helium pressure test Don attempted to connect to the RGA via the network. He was unable to do so. This scan was desired so a pre
and post water scan could be compared to indicate if there was any leaking. It has been decided to carry on as the HV and HP tests are of greater importance.
Don will continue to investigate the RGA. Travis inspected from the conditioning station roof and determined that the RGA is getting power.
    Reply  Thursday, September 26, 2013, 15:25, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, HV conditioning TM3_NiO#2_Frist_Attempt_HV_conditioning_Bias_and_El_V_and_I.JPG


    
        
            Bevan Moss wrote:
        
        
            
             The first attempt at HV conditioning of TM3 with the new source tray and NiO#2 target installed.
Entry  Friday, September 27, 2013, 10:54, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, module move 
TM#3 with NiO#2 has been moved to the south hot cell from the conditioning station.
Entry  Friday, September 27, 2013, 12:53, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, HP TGHT and TBHT conditioning 26092013_TM3_NiO#2_HP_testing.JPG26092013_TM3_NiO2_HP_testing.txt
 Yesterday TM3 had the TGHT current raised to 160 amps and the TBHT raised to 200 amps. At this power the TGHT showed typical results in that vacuum
was affected and the increased voltage as the target increased in temperature. The tube heater on the other hand did not change voltage or show a change
in vacuum. As a result it is believe there is a short somewhere in the module. I have attached a screen shot of the strip tool and the raw data.
Entry  Monday, September 30, 2013, 14:00, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, module move 
TM#3 with NiO#2 has been move from south hot cell to the conditioning station.
Entry  Monday, September 30, 2013, 16:02, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, Vacuum 
 The roughing pump for TCS was started at ~3:00 and the turbo's turned on at ~4:00. This is the minimum time for the module to pump down.