549
|
Tuesday, November 19, 2013, 14:24 |
David Wang | ITE | Repair | | | ITE TP3 | Hi
all, The old ITE TP3 pump is
moved out and the new pump is in |
|
|
555
|
Friday, November 22, 2013, 10:29 |
Travis Cave | Spent Target Vault | Standard Operation | | NiO#2 | Spent target move | NiO#2 has been moved from the south hot
cell into spent target storage. It was placed
in pail 111 in slot 3C of the storage vault. |
|
|
557
|
Tuesday, November 26, 2013, 14:10 |
Travis Cave | Crane | Maintenance | | | Thermal relay replaced | The bad thermal motor protection relay
for the crane has been replaced with a new
unit. Crane was tested in pendant(local) |
|
|
564
|
Tuesday, December 03, 2013, 10:35 |
Travis Cave | ITW | Standard Operation | | | fields above and in the target station with blocks off | The blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level |
|
|
576
|
Monday, December 09, 2013, 13:15 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#41 | Spent target move | The spent Ta#41 target has been moved from
the south hot cell to the spent target storage
vault. It is an unnumbered pail (should be |
|
|
579
|
Thursday, January 09, 2014, 11:07 |
chad fisher | South Hot-Cell | Maintenance | | | Field Level | I have managed to reduce the field at the
broken manipulator from 12 mSv/h to 400 uSv/h. |
|
|
580
|
Thursday, January 16, 2014, 10:36 |
chad fisher | South Hot-Cell | Repair | | | East Manipulator Repair | The repair/cable replacement on the east
manipulator is now complete.
Yesterday's initail cable replacement |
|
|
583
|
Monday, January 20, 2014, 13:40 |
maicodallavalle | Spent Target Vault | Maintenance | | F-308 | Empty F-308s | Four empty F-308s just arrived back at
Triumf. I moved them from shipping
to the Remote Handling Shop for service and |
|
|
586
|
Wednesday, January 22, 2014, 10:51 |
David Wang | ITE | Repair | | | Removed 4 shielding blocks located on top of preseperator in TH | Travis and I removed 4 shielding blocks
located on top of pre-seperator in
TH. This is a job for ITE harp 9 re-installation |
|
|
587
|
Wednesday, January 22, 2014, 15:00 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#8 | Spent target move | UC#8 has been moved from the south hot
cell to the vault storage. It was placed
in pail 113 and placed in slot 8A of the |
|
|
588
|
Wednesday, January 22, 2014, 15:20 |
Anders Mjos | South Hot-Cell | Standard Operation | | UC#8 | Target Inspection - post beam | The Target Assembly was inspected with
Chad, Jens Henning and Anders today.
The Target Container was |
|
|
590
|
Monday, February 03, 2014, 14:45 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent targets to mini storage and the F-308s to the Target Hall | Targets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The |
|
|
594
|
Wednesday, February 05, 2014, 14:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | All targets in the mini storage (4) have
been moved from there and placed into the
F-308s and those have been moved to the mech |
|
|
618
|
Tuesday, March 11, 2014, 10:47 |
Travis Cave | ITE | Repair | | | entrance module move | ITE entrance module has been moved from
the east station to the south east silo. |
|
|
620
|
Wednesday, March 12, 2014, 16:33 |
Keith C Ng | ITE | Repair | | | 2A3 window removal and replacement | prep'ed area for work:
- removed shield plug from window
clamp area |
|
|
622
|
Thursday, March 13, 2014, 16:23 |
Keith C Ng | ITE | Repair | | | 2a3 window - inspection | Video inspected 2a3 window joint this morning.
Screenshots from video showing debris
forming around aluminum cradle and brown/red |
|
|
623
|
Monday, March 17, 2014, 15:39 |
Keith C Ng | ITE | Repair | | | 2a3 window - prep and clean | Cleaned top of the ITE vacuum flange and
top of window clamp. Attempted to clean the
bellows/beam pipe through the wall, mostly |
|
|
624
|
Tuesday, March 18, 2014, 16:01 |
Keith C Ng | ITE | Repair | | | 2a3 window - prep and clean | Continued with vacuuming inside wall penetration
to remove debris. Changed filter bag in nilfisk
vacuum, left old filter in place however |
|
|
626
|
Wednesday, March 19, 2014, 16:48 |
Keith C Ng | ITE | Repair | | | 2a3 window - beam tube removal | Today:
1) Vaccumed top and around clamp.
Disconnected clamp from flanges and removed |
11x |
|
628
|
Friday, March 21, 2014, 16:49 |
Keith C Ng | ITE | Repair | | | 2a3 window - tank flange inspection | Today:
1) Cleaned flange with methanol and