Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 518     Entry time: Tuesday, October 22, 2013, 16:52
Author: Bevan Moss 
Category: Conditioning Station 
Type: Repair 
Module:  
Target/Number:  
Subject: Canbus base card for BIAS  

 The base card in the canbus BIAS module was determined to be faulty. Dave Morris removed a card VECC to repair the conditioning station. 

ELOG V2.9.2-2455