Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 432     Entry time: Wednesday, August 28, 2013, 14:17
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number: UC#6 
Subject: Spent target move 

Spent target move, UC#6 has been moved from the south hot cell to the target storage. The target is in pail 108 and in slot 8C of the vault. See attached PDF for details.

Attachment 1: Vault_Storage_August_28_2013.pdf  51 kB  Uploaded Tuesday, September 03, 2013, 10:19  | Show | Hide all
ELOG V2.9.2-2455