ID Date Author Categorydown Type Module Target/Number Subject
  143   Friday, July 06, 2012, 14:38 David WangConditioning StationStandard OperationTM4UO#3TM4 UO#3 target heat shield helium pressure check is done.

Connected leak detector to TM4 and CS vacuum system. The vacuum readings on TM4 and CS:PNG4 3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic box) 3.9xE-6 Torr. Leak detector base pressure:6.0xE-3 torr, base leak rate: 1.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit for 5 mins . There is no response on leak detector. The heat shield circuit is leak tight.

  155   Tuesday, July 31, 2012, 14:04 Travis CaveConditioning StationStandard OperationTM1UCx#4module move

TM#1 with UCx#4 has been moved from the south  hot hell to the conditioning station. No problems with the move.

  156   Wednesday, August 01, 2012, 09:14 Travis CaveConditioning StationStandard OperationTM1UCx#4Electrical check

TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results.

Attachment 1: TM#1_UC#4_under_vac.PDF
TM#1_UC#4_under_vac.PDF
  157   Thursday, August 02, 2012, 07:48 David WangConditioning StationStandard OperationTM1UCxTM1 UCx target heat shield helium pressure check is done.

Connected leak detector to TM1 and CS vacuum system. The vacuum readings on TM1 and CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic box) 3.4xE-6 Torr. Leak detector base pressure:0.0xE-4 torr, base leak rate: 0.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit for 4 mins . There is no response on leak detector. The heat shield circuit is leak tight.

  169   Wednesday, September 05, 2012, 11:55 Travis CaveConditioning StationStandard OperationTM4NiO#1module move

TM#4 with NiO#1 has been moved from the south hot cell to the conditioning station. Move went well.

  171   Wednesday, September 05, 2012, 14:40 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical check

See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat a few days under vacuum.

Attachment 1: TM#4_NiO#1.PDF
TM#4_NiO#1.PDF
  172   Friday, September 07, 2012, 08:54 David WangConditioning StationStandard OperationTM4NiO #1TM4 NiO #1 target heat shield helium pressure check is done.

leak detector pumped down to 0.0xE-9 atm.cc/sec, and 0.0xE-4 torr. All high vacuum gauge readings at CS and TM4 are at low -6 range from 2.2xE-6torr to 4.2x E-6 torr. Applied 80 psi helium  to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit is leak tight.

  174   Friday, September 07, 2012, 10:37 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical check

Electrical check of the TM#4 with NiO#1 was done again today. see attached file for results.

Attachment 1: TM#4_NiO#1a.PDF
TM#4_NiO#1a.PDF
  184   Wednesday, September 19, 2012, 11:24 Travis CaveConditioning StationStandard OperationTM1Nb#7module move

TM#1 with Nb#7 was moved from the south hot cell to the conditioning station. Move went well.

  185   Thursday, September 20, 2012, 08:45 Travis CaveConditioning StationStandard OperationTM1Nb#7Electrical check

Electrical check was done at the conditioning station this morning results are on the attached PDF.

Attachment 1: TM1_Nb7_Elec_chk_CS.PDF
TM1_Nb7_Elec_chk_CS.PDF
  186   Thursday, September 20, 2012, 09:16 David WangConditioning StationStandard OperationTM1Nb#7TM1 Nb#7 target heat shield helium pressure check is done.

Leak detector pumped down to base LR1.3xE-9 atm.cc/sec, and BP 8xE-3 torr. All high vacuum gauge readings at CS and TM1 are at low -6 range from 1.2xE-6torr to 4.6x E-6 torr. Applied 80 psi helium  to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit is leak tight.

  191   Thursday, October 04, 2012, 11:06 David WangConditioning StationRepair  Replace conditioning station scroll pump in target hall

Grant and I replaced the conditioning station broken  srcoll pump with a refurbished scroll pump which is supplied by vacuum group. The replaced pump is bagged and waiting for RPG further survey in target hall . The target hall is survey after the job, and everything is fine.

  195   Tuesday, October 09, 2012, 14:53 Bevan MossConditioning StationDevelopmentTM4UCx#5Module Move

TM4 was remote moved from the SCH to the TCS today. This was the first time the module was moved with the framework for the cage in place. The ion gauge on the service cap is closer to the cage than anticipated and as a result the pins for the gauge were sheared off. Discussion as to how to repair the gauge (both short term and long term needs to be had). We will try and rough down the TM tonight, it is not believed the vacuum will be affected.

  196   Tuesday, October 16, 2012, 07:14 David WangConditioning StationStandard OperationTM4UCX#5TM4 heat shield helium pressure test and electrical check at CS

TM4 heat shield helium pressure test and electrical check were done  at CS  last week. The results are good. NO leak had been found on heat shield circuit.The electrical check is also good.

  207   Wednesday, November 07, 2012, 10:25 Travis CaveConditioning StationStandard OperationTM1TiC#3module move

TM#1 with TiC#3 has been moved from the south hot cell to the conditioning station, move went well.

  209   Thursday, November 08, 2012, 08:42 David WangConditioning StationStandard OperationTM1TiC #3TM1 TiC #3 target heat shield helium pressure check is done.

TM1 TiC #3 target  heat shield  helium pressure check  is done at conditioning station. Applied 80 psi helium to HS circuit for 5 minutes . There is no response had been found on leak detector. The leak detector base LR 0.0x E-9 atm.cc/sec, and BP 0.0xE-4 torr. CS and TM1 vacuum are at low E-6 torr range. The HS circuit is leak tight.

  211   Friday, November 09, 2012, 09:20 Travis CaveConditioning StationStandard OperationTM1TiC#3Electrical check

Electrical check performed on TM#1 with TiC#3 at the conditioning station under vacuum. See PDF for details.

Attachment 1: TM_1_TiC_3_Elec_check_CS_Vac.PDF
TM_1_TiC_3_Elec_check_CS_Vac.PDF
  236   Friday, January 18, 2013, 11:15 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module move

TM#4 with the test target #1 is now in the conditioning station, move went well.

  238   Friday, January 18, 2013, 16:56 Grant MinorConditioning StationStandard OperationTM4 VAT valve btwn roughing and nuc. vent. closed

Bevan attempted to start pumping down on TM4 today remotely but there was an issue.  He will report on Monday.

I went into the Target Hall this afternoon while on the phone with Bevan and performed the following:

- Checked the knurled vent valves on the side of each turbo, both were found to be in the tightened position (all the way clockwise)

- Closed the VAT valve between the scroll pump and the nuclear ventilation

  239   Friday, January 18, 2013, 17:01 Grant MinorConditioning StationDevelopmentTM4 Photos of the CS with TM4 (after the no-module HV test, only vacuum connected)

Attached are some photos of TM4 in the Conditioning Station after the no-module HV test completion.  Only vacuum services are connected.

Attachment 1: CS_post_HV_test_w_TM4_18Jan2013_001.jpg
CS_post_HV_test_w_TM4_18Jan2013_001.jpg
Attachment 2: CS_post_HV_test_w_TM4_18Jan2013_003.jpg
CS_post_HV_test_w_TM4_18Jan2013_003.jpg
Attachment 3: CS_post_HV_test_w_TM4_18Jan2013_004.jpg
CS_post_HV_test_w_TM4_18Jan2013_004.jpg
Attachment 4: CS_post_HV_test_w_TM4_18Jan2013_005.jpg
CS_post_HV_test_w_TM4_18Jan2013_005.jpg