Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2305
Entry time:
Tuesday, February 15, 2022, 11:18
Author:
Frank Song
Category:
Cooling
Type:
Repair
Module:
Target/Number:
Subject:
Replace 2 leak valves on high active water system
The valves #V10 & V11 beside high active water pumps were replaced in Target Hall, pics attached.
Attachment 1:
v10_v11.jpg
508 kB
|
Show
|
Hide all
Attachment 2:
v10.jpg
574 kB
|
Show
|
Hide all
Attachment 3:
v11.jpg
467 kB
|
Show
|
Hide all
ELOG V2.9.2-2455