Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2763     Entry time: Monday, February 03, 2025, 13:10
Author: David Wang 
Category: Cooling 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: HALCW pump ITC:MP1 has been started.  

HALCW pump ITC:MP1 has been started. water are supplied to both ITE and ITW system. all water signals for individual circuits work fine. no major leak on system. Some small water seeping from small ball valve stems are found in ITW. they will be fixed soon.

ELOG V2.9.2-2455