Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 102 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Moduledown Target/Number Subject
  549   Tuesday, November 19, 2013, 14:24 David WangITERepair  ITE TP3
Hi all, The old  ITE TP3 pump is moved out and the new pump is  in postion .Since this time I used a new holding ring(1 piece) insead of old 2 pieces holding ring which are thicker than new ring, the old holding  bolts are a little bit too long for the thread holes on the  ITE exit 1. I have to find the right length bolts for this new holding ring. The pump is in position,and all connection are done except the holding bolts. I will put the new bolts on and tight them when I connect the TM4 in ITE next time. So, If I am not here at that time and you need to connect TM4 and start the pumps in ITE, please check all the bolts are tighted before you do anything.
  555   Friday, November 22, 2013, 10:29 Travis CaveSpent Target VaultStandard Operation NiO#2Spent target move

NiO#2 has been moved from the south hot cell into spent target storage. It was placed in pail 111 in slot 3C of the storage vault. It was 76.4mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_November_22_2013.pdf
Vault_Storage_November_22_2013.pdf Vault_Storage_November_22_2013.pdf Vault_Storage_November_22_2013.pdf Vault_Storage_November_22_2013.pdf
  557   Tuesday, November 26, 2013, 14:10 Travis CaveCraneMaintenance  Thermal relay replaced

The bad thermal motor protection relay for the crane has been replaced with a new unit. Crane was tested in pendant(local) operation and all drives worked.

  564   Tuesday, December 03, 2013, 10:35 Travis CaveITWStandard Operation  fields above and in the target station with blocks off

The blocks have been removed from the west target station. The fields at the top of the target pit at the railing at waist level is about 80uSv/hr, Turbo pumps are about 805uSv/hr, backing lines for the turbos about a 1mSv/hr and the average field in the area of work down in the pit is about 600 to 750uSv/hr. The proton beam went off at 10:45 on December 2nd, these measurements were done at 09:00 on December 3rd.

 

Another set of field measurement was done at the west target station. At the top of the west target station at the railing the field ranged from 50 to 70 uSv/hr. The turbo pumps had field of about 650uSv/hr, the area over the dump was about 750uSv/hr, the area over the HV cover and the south side was about 450uSv/hr. These measurements were done at 13:15 on December 3rd.

  576   Monday, December 09, 2013, 13:15 Travis CaveSpent Target VaultStandard Operation Ta#41Spent target move

The spent Ta#41 target has been moved from the south hot cell to the spent target storage vault. It is an unnumbered pail (should be pail 112) and placed in spot 7A of the vault it had a reading of 536mSv/hr upon removal from the south hot cell. See attached PDF for vault details.

Attachment 1: Vault_Storage_December_9_2013.pdf
Vault_Storage_December_9_2013.pdf Vault_Storage_December_9_2013.pdf Vault_Storage_December_9_2013.pdf Vault_Storage_December_9_2013.pdf
  579   Thursday, January 09, 2014, 11:07 chad fisherSouth Hot-CellMaintenance  Field Level

I have managed to reduce the field at the broken manipulator from 12 mSv/h to 400 uSv/h.

  580   Thursday, January 16, 2014, 10:36 chad fisherSouth Hot-CellRepair  East Manipulator Repair

The repair/cable replacement on the east manipulator is now complete.

Yesterday's initail cable replacement went very well however, due to a minor glich, we were unable to test the tong movement until I was out of the hot cell. Tong did not fully close and felt like there was a "hard stop" at a repeatable spot in the  closing of the tong. Upon further investagation, I determined that the problem was definelty on the slave side.

I conducted a troublshooting exercise this morning to narrow down the problem. I quickly found that the new tong came from the manufacture with two incorrect fasteners (socket head cap screws) instead of set screws. As a result the tong was being kept from closing as the head of the socket head cap screws was interfering.

I replaced the SHCS was the set screws from the old tong. The tong now functions with full range of motion.

Jan. 15, 37 minutes in cell .26 mSv

Jan. 16, 16 minutes in cell (as I did some clean up of compressable waste) .05 mSv

Also, the inital repair utilized a prototype tool I designed (and with assistance from Maico, built). This tool made the repair much easier. I will be making small improvements to the design and issuing drawings to the vault and shop.

 

 

Attachment 1: Manip_repair_20140114.jpg
Manip_repair_20140114.jpg
Attachment 2: Manip_repair_20140115.jpg
Manip_repair_20140115.jpg
  583   Monday, January 20, 2014, 13:40 maicodallavalleSpent Target VaultMaintenance F-308Empty F-308s

Four empty F-308s just arrived back at Triumf. I moved them  from shipping to the Remote Handling Shop for service and inspection. I will work on them when not busy with my other shutdown work. ( Cyclotron work)

  586   Wednesday, January 22, 2014, 10:51 David WangITERepair  Removed 4 shielding blocks located on top of preseperator in TH

Travis and I removed 4 shielding blocks located on top of pre-seperator  in TH. This is a job for ITE harp 9 re-installation after it  is repaired . The blocks move are successful.

  587   Wednesday, January 22, 2014, 15:00 Travis CaveSpent Target VaultStandard Operation UC#8Spent target move

UC#8 has been moved from the south hot cell to the vault storage. It was placed in pail 113 and placed in slot 8A of the vault. The field was 9.2mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_January_22_2014.pdf
Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf
  588   Wednesday, January 22, 2014, 15:20 Anders MjosSouth Hot-CellStandard Operation UC#8Target Inspection - post beam

The Target Assembly was inspected with Chad, Jens Henning and Anders today.

  • The Target Container was broken.
  • Material was deposited on the Heat Shield around the Target Center Block
  • Material was deposited on the IG-LIS source.
  • Electrical checks to ground (HS)
    • The Extraction Electrode passed the electrical check at 1000V
    • The Exit Electrode (c) held only 40V at 22 kOhm
    • The IG Electrode 1 (f) held 250V at 390 MOhm
    • The IG Electrode 2 (g) held only 40V at 22 kOhm
  • IG 1 and IG 2 both held 250V at 450 MOhm to Exit Electorde (c)
  • No spark marks were observed on the 9-pin connector

See photos of the inspection on DocuShare

  590   Monday, February 03, 2014, 14:45 Travis CaveSpent Target VaultStandard Operation  Spent targets to mini storage and the F-308s to the Target Hall

Targets NiO#1(101), Nb#5(85), TaC#1(92), and ZrC#5(81) have been moved from the storage vault and placed in the mini storage. The F-308 flasks have also been moved in to the target hall as well. The attached are the current statuses of both vaults.

Attachment 1: Vault_Storage_February_3_2014.pdf
Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf
Attachment 2: Mini_Vault_Storage_February_3_2014.pdf
Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf
  594   Wednesday, February 05, 2014, 14:12 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308s

All targets in the mini storage (4) have been moved from there and placed into the F-308s and those have been moved to the mech services room.

  618   Tuesday, March 11, 2014, 10:47 Travis CaveITERepair  entrance module move

ITE entrance module has been moved from the east station to the south east silo.

  620   Wednesday, March 12, 2014, 16:33 Keith C NgITERepair  2A3 window removal and replacement

prep'ed area for work:

- removed shield plug from window clamp area

- inspected clamp from tunnel side and from top of target station: video recorder was not working, will try again tomorrow.

- corrosion seen on beam pipe cradles, see photos. corrosion also seen on beampipe, clamp and vacuum tank. will try to vaccuum loose rust tomorrow.

note: gamma spec of rust, white powder from RPG located in \\trwindata\groups\remote handling\Documents\2014\2A3 Window folder (added pdfs as attachments 2014 mar 4)

 

20140312_2a3window_RHB_6676.JPG

20140312_2a3window_RHB_6682.JPG

 

Attachment 3: 2a_bp_sw1_white_powder_under_w11.PDF
2a_bp_sw1_white_powder_under_w11.PDF 2a_bp_sw1_white_powder_under_w11.PDF 2a_bp_sw1_white_powder_under_w11.PDF 2a_bp_sw1_white_powder_under_w11.PDF 2a_bp_sw1_white_powder_under_w11.PDF 2a_bp_sw1_white_powder_under_w11.PDF
Attachment 4: 2a_bp_sw2_white_powder_under_w11.PDF
2a_bp_sw2_white_powder_under_w11.PDF 2a_bp_sw2_white_powder_under_w11.PDF 2a_bp_sw2_white_powder_under_w11.PDF 2a_bp_sw2_white_powder_under_w11.PDF 2a_bp_sw2_white_powder_under_w11.PDF
Attachment 5: 2a_bp_sw3_rust_w11.PDF
2a_bp_sw3_rust_w11.PDF 2a_bp_sw3_rust_w11.PDF 2a_bp_sw3_rust_w11.PDF 2a_bp_sw3_rust_w11.PDF 2a_bp_sw3_rust_w11.PDF
  622   Thursday, March 13, 2014, 16:23 Keith C NgITERepair  2a3 window - inspection

Video inspected 2a3 window joint this morning.

Screenshots from video showing debris forming around aluminum cradle and brown/red dust on top of beam pipe.

Fullscreen_capture_03132014_41458_PM.bmp.jpgFullscreen_capture_03132014_41527_PM.bmp.jpg

Inspection video can be seen in its entirety at \\trwindata\groups\remote handling\Videos\2014\2014_2A3window

  623   Monday, March 17, 2014, 15:39 Keith C NgITERepair  2a3 window - prep and clean

Cleaned top of the ITE vacuum flange and top of window clamp. Attempted to clean the bellows/beam pipe through the wall, mostly dust and small particles. When cleaning bottom of the wall penetration we picked up a stone/fragment and the vacuum stopped. Appears to be a rock of some kind. 800cpm.

Videos on \\trwindata\groups\remote handling\Videos\2014\2014_2A3window folder, videos 3 and 4.

  624   Tuesday, March 18, 2014, 16:01 Keith C NgITERepair  2a3 window - prep and clean

Continued with vacuuming inside wall penetration to remove debris. Changed filter bag in nilfisk vacuum, left old filter in place however vacuum continues to stall after >5min use. Vacuum gets quite warm before self shutting off. Debris seems to be falling back down on to joint if vacuum is turned off.

Took some screenshots of video showing removed debris and rust(?) on beam pipe. Video located on remote handling group folder.

Will attempt to remove clamp tomorrow.

 

Fullscreen_capture_03182014_35409_PM.bmp.jpgFullscreen_capture_03182014_35316_PM.bmp.jpg

  626   Wednesday, March 19, 2014, 16:48 Keith C NgITERepair  2a3 window - beam tube removal

Today:

1) Vaccumed top and around clamp. Disconnected clamp from flanges and removed from beam line. Currently bagged and stored in metal pail next to target pit area. Clamp is 500 µSv @ 1/2 m.

 20140319_2a3window_IMG_0813.JPG20140319_2a3window_IMG_0815.JPG20140319_2a3window_IMG_0814.JPG20140319_2a3window_IMG_0819.JPG

 

2) Removed 2A3 window from beam line. Pried apart joint from top of target station using pole tool. Window is 95 mSv o.c. 5000 µSv @ 1/2 m. Currently stored in a metal shield & covered with lead blanket infront of spent target vault.

20140319_2a3window_IMG_0823.JPG20140319_2a3window_IMG_0824.JPG20140319_2a3window_IMG_0828.JPG20140319_2a3window_IMG_0829.JPG

 

3) Did preliminary clean of tank side flange with cotton glove. See videos in RH group folder. A mark still remains on flange.

 

4) Installed dust cover over tank flange.

 

5) Removed old leaking beam tube + support from wall penetration. Currently stored in 2A tunnel, both pieces are bagged. 500 µSv @1/2m, 12000 µSv o.c. Took 2 vials/samples of the deposits inside the plastic piping surrounding the beam tube supports. Material appears to be crystalline and moist.

20140319_2a3window_RHB_6711.JPG20140319_2a3window_IMG_0834.JPG20140319_2a3window_IMG_0843.JPG

  628   Friday, March 21, 2014, 16:49 Keith C NgITERepair  2a3 window - tank flange inspection

Today:

1) Cleaned flange with methanol and cotton glove, appears to be clean.

20140321_2a3window_IMG_0846.JPG

 

2) Installed new beam tube and cradle into wall penetration, cradle was setup same as previous cradle (which is now removed). On advancing into position, the flange on the flexible bellows appears to get stuck on the spigot of the fixed tank flange. Removed and measured slot, is undersize (.373-.374), will re-machine slot for spigot.

20140321_2a3window_P1030055.JPG20140321_2a3window_P1030057.JPG

 

3) On visual inspection, ITE tank flange appears to be warped in a location consistent with the clamping area of the window clamp. Further investigation is required.

20140321_2a3window_RHB_6777.JPG

ELOG V2.9.2-2455