488
|
Thursday, October 03, 2013, 10:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the south hot cell to the south west silo. |
|
487
|
Wednesday, October 02, 2013, 14:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check | Electrical check done on TM#4 with no target,
see PDF. |
|
486
|
Wednesday, October 02, 2013, 13:44 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Right Coil is leaking | Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the |
|
485
|
Wednesday, October 02, 2013, 09:40 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HP conditioning | Yesterday the TBHT was ramped to 250 amp
and the TGHT was ramped to 440 amps. Attached
is the data from that run the strip tool |
|
484
|
Tuesday, October 01, 2013, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | Electrical check | TM#3 with NiO#2 electrical check at conditioning
station under vacuum, see pdf for details. |
|
483
|
Tuesday, October 01, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | TM#4 with SiC#29 electrical check post
beam see pdf for details. |
|
482
|
Monday, September 30, 2013, 16:04 |
Bevan Moss | Conditioning Station | Repair | TM3 | NiO#2 | Ion gauge filament replacement | The filament on IG1 for TM3 was replaced
by myself and Edi. The old filament did not
appear to be damaged but the controller claimed |
|
481
|
Monday, September 30, 2013, 16:02 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | Vacuum | The roughing pump for TCS was started
at ~3:00 and the turbo's turned on at ~4:00.
This is the minimum time for the module to |
|
480
|
Monday, September 30, 2013, 16:00 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
|
|
479
|
Monday, September 30, 2013, 15:59 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Module move from SW Silo to SHC | TM4 was move by myself and Grant.
Move went smoothly, no hang ups. |
|
478
|
Monday, September 30, 2013, 14:00 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | module move | TM#3 with NiO#2 has been move from south
hot cell to the conditioning station. |
|
477
|
Monday, September 30, 2013, 12:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check | Results of the various electrical checks
done on TM#3 while at the hot cell since
the 27th of September. View PDF for the details. |
|
476
|
Friday, September 27, 2013, 12:53 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HP TGHT and TBHT conditioning | Yesterday TM3 had the TGHT current
raised to 160 amps and the TBHT raised to
200 amps. At this power the TGHT showed typical |
|
475
|
Friday, September 27, 2013, 10:54 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | module move | TM#3 with NiO#2 has been moved to the south
hot cell from the conditioning station. |
|
474
|
Thursday, September 26, 2013, 15:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HV conditioning |
|
|
473
|
Thursday, September 26, 2013, 15:00 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | RGA not connecting | Following the helium pressure test
Don attempted to connect to the RGA via the
network. He was unable to do so. This scan |
|
472
|
Thursday, September 26, 2013, 14:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HV conditioning | The first attempt at HV conditioning
of TM3 with the new source tray and NiO#2
target installed. Conditioning so far has |
|
471
|
Thursday, September 26, 2013, 14:47 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | NiO#2 | Water pumps turned on | The water pumps for the conditioning
station were turned on at ~11:45. It took
longer to start the conditioning station |
|
470
|
Thursday, September 26, 2013, 14:42 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 |
|
|
469
|
Thursday, September 26, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | Leak check / Pressure Test |
|
|