Entry  Thursday, September 26, 2013, 14:55, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, HV conditioning 26092013_TM3_NiO2_HV_conditioning_first_attempt.txt
    Reply  Thursday, September 26, 2013, 15:25, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, HV conditioning TM3_NiO#2_Frist_Attempt_HV_conditioning_Bias_and_El_V_and_I.JPG
Message ID: 472     Entry time: Thursday, September 26, 2013, 14:55     Reply to this: 474
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM3 
Target/Number: NiO#2 
Subject: HV conditioning 

 The first attempt at HV conditioning of TM3 with the new source tray and NiO#2 target installed. Conditioning so far has been very slow, with the current increasing quickly to a maximum of 400uA. Voltage in these cases was lowered until the current was below 200uA. Attached is the raw data. It appears the source tray and target are conditioning just there is either something burning off or there is localized poor vacuum.

Attachment 1: 26092013_TM3_NiO2_HV_conditioning_first_attempt.txt  1.183 MB  | Show | Hide all