  488   Thursday, October 03, 2013, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the south hot cell to the south west silo.
  
  487   Wednesday, October 02, 2013, 14:47 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical checkElectrical check done on TM#4 with no target,
see PDF.
 TM#4_elec_chk_No_Tgt_SHC.PDF 
  486   Wednesday, October 02, 2013, 13:44 Bevan MossSouth Hot-CellStandard OperationTM4 Right Coil is leaking Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the
 tm4leak.jpg 
  485   Wednesday, October 02, 2013, 09:40 Bevan MossConditioning StationStandard OperationTM3NiO#2HP conditioningYesterday the TBHT was ramped to 250 amp
and the TGHT was ramped to 440 amps. Attached
is the data from that run the strip tool
 01102013_TM3_NiO2_TGHT_and_TBHT_ramp_up_eod.txt02102013_TM3_NiO#2_HP_testing_overnight_run.JPG02102013_TM3_NiO#2_HP_testing_overnight_run_archiver.JPG 
  484   Tuesday, October 01, 2013, 11:00 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical checkTM#3 with NiO#2 electrical check at conditioning
station under vacuum, see pdf for details.
 TM#3_elec_chk_NiO#2_CS2.PDF 
  483   Tuesday, October 01, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkTM#4 with SiC#29 electrical check post
beam see pdf for details.
 TM#4_elec_chk_SiC#29_SHC_post2.PDF 
  482   Monday, September 30, 2013, 16:04 Bevan MossConditioning StationRepairTM3NiO#2Ion gauge filament replacement  The filament on IG1 for TM3 was replaced
by myself and Edi. The old filament did not
appear to be damaged but the controller claimed
  
  481   Monday, September 30, 2013, 16:02 Bevan MossConditioning StationStandard OperationTM3NiO#2Vacuum The roughing pump for TCS was started
at ~3:00 and the turbo's turned on at ~4:00.
This is the minimum time for the module to
  
  480   Monday, September 30, 2013, 16:00 Bevan MossSouth Hot-CellStandard OperationTM3NiO#2Electrical check

    

       
            
  
  479   Monday, September 30, 2013, 15:59 Bevan MossSouth Hot-CellStandard OperationTM4SiC#29Module move from SW Silo to SHC TM4 was move by myself and Grant.
Move went smoothly, no hang ups.
  
  478   Monday, September 30, 2013, 14:00 Travis CaveConditioning StationStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been move from south
hot cell to the conditioning station.
  
  477   Monday, September 30, 2013, 12:23 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2Electrical checkResults of the various electrical checks
done on TM#3 while at the hot cell since
the 27th of September. View PDF for the details.
 TM#3_elec_chk_NiO#2_SHC2.PDF 
  476   Friday, September 27, 2013, 12:53 Bevan MossConditioning StationStandard OperationTM3NiO#2HP TGHT and TBHT conditioning Yesterday TM3 had the TGHT current
raised to 160 amps and the TBHT raised to
200 amps. At this power the TGHT showed typical
 26092013_TM3_NiO#2_HP_testing.JPG26092013_TM3_NiO2_HP_testing.txt 
  475   Friday, September 27, 2013, 10:54 Travis CaveConditioning StationStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been moved to the south
hot cell from the conditioning station.
  
  474   Thursday, September 26, 2013, 15:25 Bevan MossConditioning StationStandard OperationTM3NiO#2HV conditioning

    

       
            
 TM3_NiO#2_Frist_Attempt_HV_conditioning_Bias_and_El_V_and_I.JPG 
  473   Thursday, September 26, 2013, 15:00 Bevan MossConditioning StationStandard OperationTM3NiO#2RGA not connecting Following the helium pressure test
Don attempted to connect to the RGA via the
network. He was unable to do so. This scan
  
  472   Thursday, September 26, 2013, 14:55 Bevan MossConditioning StationStandard OperationTM3NiO#2HV conditioning The first attempt at HV conditioning
of TM3 with the new source tray and NiO#2
target installed. Conditioning so far has
 26092013_TM3_NiO2_HV_conditioning_first_attempt.txt 
  471   Thursday, September 26, 2013, 14:47 Bevan MossConditioning StationMaintenanceTM3NiO#2Water pumps turned on The water pumps for the conditioning
station were turned on at ~11:45. It took
longer to start the conditioning station
  
  470   Thursday, September 26, 2013, 14:42 Bevan MossSouth Hot-CellRepairTM3NiO#2Activities September 24 - 25

    

       
            
  
  469   Thursday, September 26, 2013, 14:37 Bevan MossConditioning StationStandard OperationTM3NiO#2Leak check / Pressure Test

    

       
            
  