|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
378
|
Thursday, June 13, 2013, 09:18 |
chad fisher | South Hot-Cell | Repair | TM3 | | Source Tray/Extraction Column Removal | TM3 Rev 2 source tray/extraction column
insertion into its storage was completed
yesterday and it was then removed from the |
|
|
377
|
Wednesday, June 12, 2013, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | | | spent source tray removal | The spent source tray for TM#3 has been
removed from the south hot cell and well
be placed in the the hot cell ante room. |
|
|
376
|
Tuesday, June 11, 2013, 10:05 |
David Wang | ITW | Standard Operation | TM1 | | Disconnected TM1 in ITW. | Dan and I disconnected TM1 in ITW. |
|
|
375
|
Tuesday, June 04, 2013, 15:34 |
Bevan Moss | Conditioning Station | Repair | | | Relay replaced | ESC was called out again to inspect the
chiller as it was showing the same problem
as before. This time when started one fan |
|
|
374
|
Tuesday, June 04, 2013, 12:36 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks are transferred from ITW to ITE | Dan an I transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam. |
|
|
373
|
Friday, May 31, 2013, 11:19 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#28 (RFQ Target) | Spent target move | Spent target SiC#28 (RFQ Target) has been
moved from the south hot to the storage vault.
The target was placed in pail #105 in spot |
|
|
372
|
Wednesday, May 29, 2013, 12:07 |
chad fisher | South Hot-Cell | Development | | SiC#28 RFQ | RFQ Autopsy | Major portions of the RFQ target have now
been sucessfully dismantled. More minor dismantling
with conclude this afternoon. |
|
|
371
|
Wednesday, May 29, 2013, 06:32 |
David Wang | ITE | Standard Operation | TM4 | Ta#40 | TM4 has been connected in ITE. | TM4 has been connected in ITE. The pumping
down is fine so far.TM4 water interlock check
was done yesterday. |
|
|
370
|
Tuesday, May 28, 2013, 10:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check | Results of the electrical check on
TM#4 with Ta#40, it passed. See attached
PDF for results. |
|
|
369
|
Tuesday, May 28, 2013, 10:37 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well. |
|
|
368
|
Monday, May 27, 2013, 16:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta#40 | Argon Venting Started | Argon venting has started. It will
be left to vent over night. |
|
|
367
|
Monday, May 27, 2013, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | HV conditioning | The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once |
|
|
366
|
Monday, May 27, 2013, 16:01 |
Bevan Moss | Conditioning Station | Repair | | | CanBUS card | During HV conditioning of TM4 with
Ta#40 there was a spark at ~43 kV that caused
the Bias card to "fry". Dave Morris |
|
|
365
|
Monday, May 27, 2013, 15:59 |
Bevan Moss | Conditioning Station | Repair | | | Compressor fault | Once again the 7.5 compressors are
tripping due to faults. I believe it is due
to over pressure as a result of the chiller |
|
|
364
|
Monday, May 27, 2013, 11:55 |
chad fisher | South Hot-Cell | Standard Operation | | | Special Tooling for RFQ target | The special tool made for the RFQ target
autopsy has been inserted into the hot cell.
|
|
|
363
|
Monday, May 27, 2013, 10:37 |
Bevan Moss | Conditioning Station | Maintenance | TM4 | | Cooling Systems topped off | Rob walker has flushed and refilled the
primary side of the system (note the water
still looks nasty). This morning the primary |
|
|
362
|
Monday, May 27, 2013, 10:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Pumps Started HV testing to follow | The pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily. |
|
|
361
|
Thursday, May 23, 2013, 14:12 |
Bevan Moss | Conditioning Station | Maintenance | | | Primary Circuit Drained and Flushed | Rob Walker has drained the primary
side of the conditioning station. It will
be flushed, filled and chemically treated. |
|
|
360
|
Thursday, May 23, 2013, 14:08 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Turbo Pumps on | The turbo pumps have been turned
on and are running |
|
|
359
|
Thursday, May 23, 2013, 14:07 |
Bevan Moss | Conditioning Station | Repair | | | Chiller Unit Repaired | ESC came today and "repaired"
the chiller. There was something wrong with
the VFD controller. The were able to get |
|