  ID Date Author Category Type Module Target/Number Subject Text Attachments
  2701   Wednesday, October 09, 2024, 14:04 Frank SongITEStandard OperationTM2Ta#68Module Connection TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached.
 TM2_with_new_target_Ta#68_connection_in_ITE.pdf 
  2700   Tuesday, October 08, 2024, 11:46 David WangITEStandard OperationTM2Ta#68.Tm2 has been moved form SHC to ITE.Tm2 has been moved form SHC to ITE. The
move is smooth. 
  
  2699   Tuesday, October 08, 2024, 11:45 David WangSouth Hot-CellStandard OperationTM2 Tm2 electrical check with Ta#68 installed at SHC. ABCD was dead shorted to 60kv bias during
the first time measurement after target installation.
Target was removed and reinstalled again
 TM2_Ta#68_electrical_check.pdf 
  2698   Tuesday, October 08, 2024, 11:20 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 install onto TM2, w/ Troubleshooting October 7, 2024 - Aaron Tam 
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into
 17x 
  2697   Tuesday, October 01, 2024, 12:40 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Target Ta#67 Removed from TM2  October 1, 2024 - Aaron Tam 
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting
 9x 
  2696   Tuesday, October 01, 2024, 10:55 David WangSouth Hot-CellStandard OperationTM2 TM2 has been moved from ITE to SHC.TM2 has been moved from ITE to SHC. Peter
did the move with Travis on help.  The
move is smooth. 
  
  2695   Tuesday, October 01, 2024, 09:16 Frank SongITEStandard OperationTM2Ta#67module disconnection TM2 with spent target Ta#67 was disconnected
in ITE. see attachment pls.
 TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf 
  2694   Friday, September 27, 2024, 07:29 David WangConditioning StationRepair  TCS water system resistivity analyzer has been repaired.TCS water system resistivity analyzer has
been repaired. Two diodes and one capacitor
on PS board were broken. They were replaced.
  
  2693   Wednesday, September 25, 2024, 09:12 David WangSouth Hot-CellMaintenanceTM3 Tm3 has been moved from SHC to silo.Tm3 has been moved  from SHC to silo.
the move is smooth.
  
  2692   Wednesday, September 25, 2024, 07:25 David WangCoolingMaintenance  HALCW O2 level sensor maintenance. HALCW O2 level sensor annual maintenance
is done. sensor membrane has been changed
and electrolyte has been refilled. gauge
  
  2691   Tuesday, September 24, 2024, 09:37 Frank SongITE/ITWStandard Operation  shielding blocks transfer 5 shielding blocks have been moved
from ITE to ITW.
  
  2690   Monday, September 23, 2024, 16:06 Aaron TamSouth Hot-CellRepairTM3 Insulator Addition to Water block September 23, 2024 - C. Fisher 

    Containment box removed

   Insulator installed
    New
 c02c089c-d2f0-4ddb-9f06-3dd8b8d05afa.jfif0fd6eb03-7d82-48af-8ef7-99fd481bf1aa.jfif14247104-53dc-4b00-852d-3a860c4baeb8.jfif 
  2689   Monday, September 23, 2024, 11:35 David WangITWStandard OperationTM4TiC #9.vacuum leak check on TM4 service cap in ITW. vacuum leak check on TM4 service cap in
ITW was done this morning.   leak
detector leak rate 0.0XE-9 atm.cc/sec. No
  
  2688   Monday, September 23, 2024, 11:31 David WangSouth Hot-CellDevelopmentTM3 10 pins lectrical check result after insulator is installed on water cap C. 10 pins lectrical check result after insulator
is installed on water cap C. 
pin 14 to 60kv bias has 20 Kohm @250V
  
  2687   Monday, September 23, 2024, 11:26 David WangSouth Hot-CellStandard OperationTM3 TM3 window line has been leak checked. TM3 window line has been leak checked after
containment box removal and installation
for insulator installation on water cup C.  
  
  2686   Wednesday, September 18, 2024, 13:47 David WangSouth Hot-CellStandard OperationTM3TiC#8Tm3 has been moved from silo to SHC.Tm3 has been moved  from silo to SHC.
The move is smooth. 
  
  2685   Wednesday, September 18, 2024, 13:40 Aaron TamSouth Hot-CellStandard OperationTM3TiC#8Target removal  TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under
 13x 
  2684   Tuesday, September 17, 2024, 13:42 Frank SongITWStandard OperationTM4TiC#9 Module Connection TM4 with target TiC#9 is connected
in ITW. See attachment.
 TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf 
  2683   Tuesday, September 17, 2024, 11:16 David WangITWStandard OperationTM4TiC#9TM4 has been moved from TCS to ITW.TM4 has been moved from TCS to ITW. The
move is smooth.
  
  2682   Monday, September 16, 2024, 08:48 chad fisherManipulator MaintenanceMaintenance  CRL Technicain Manipulator Maitenance TripOver the course of September 9th - September
13, 2024 a CRL manipulator technician carried
out the following manipulator maintenance:
 Triumf_Document_2024-09-20_102936.pdf 