2701
|
Wednesday, October 09, 2024, 14:04 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | Module Connection | TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached. |
|
|
2700
|
Tuesday, October 08, 2024, 11:46 |
David Wang | ITE | Standard Operation | TM2 | Ta#68. | Tm2 has been moved form SHC to ITE. | Tm2 has been moved form SHC to ITE. The
move is smooth. |
|
|
2699
|
Tuesday, October 08, 2024, 11:45 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Tm2 electrical check with Ta#68 installed at SHC. | ABCD was dead shorted to 60kv bias during
the first time measurement after target installation.
Target was removed and reinstalled again |
|
|
2698
|
Tuesday, October 08, 2024, 11:20 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 install onto TM2, w/ Troubleshooting | October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into |
17x |
|
2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 | October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting |
9x |
|
2696
|
Tuesday, October 01, 2024, 10:55 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITE to SHC. | TM2 has been moved from ITE to SHC. Peter
did the move with Travis on help. The
move is smooth. |
|
|
2695
|
Tuesday, October 01, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | module disconnection | TM2 with spent target Ta#67 was disconnected
in ITE. see attachment pls. |
|
|
2694
|
Friday, September 27, 2024, 07:29 |
David Wang | Conditioning Station | Repair | | | TCS water system resistivity analyzer has been repaired. | TCS water system resistivity analyzer has
been repaired. Two diodes and one capacitor
on PS board were broken. They were replaced. |
|
|
2693
|
Wednesday, September 25, 2024, 09:12 |
David Wang | South Hot-Cell | Maintenance | TM3 | | Tm3 has been moved from SHC to silo. | Tm3 has been moved from SHC to silo.
the move is smooth. |
|
|
2692
|
Wednesday, September 25, 2024, 07:25 |
David Wang | Cooling | Maintenance | | | HALCW O2 level sensor maintenance. | HALCW O2 level sensor annual maintenance
is done. sensor membrane has been changed
and electrolyte has been refilled. gauge |
|
|
2691
|
Tuesday, September 24, 2024, 09:37 |
Frank Song | ITE/ITW | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been moved
from ITE to ITW. |
|
|
2690
|
Monday, September 23, 2024, 16:06 |
Aaron Tam | South Hot-Cell | Repair | TM3 | | Insulator Addition to Water block | September 23, 2024 - C. Fisher
Containment box removed
Insulator installed
New |
|
|
2689
|
Monday, September 23, 2024, 11:35 |
David Wang | ITW | Standard Operation | TM4 | TiC #9. | vacuum leak check on TM4 service cap in ITW. | vacuum leak check on TM4 service cap in
ITW was done this morning. leak
detector leak rate 0.0XE-9 atm.cc/sec. No |
|
|
2688
|
Monday, September 23, 2024, 11:31 |
David Wang | South Hot-Cell | Development | TM3 | | 10 pins lectrical check result after insulator is installed on water cap C. | 10 pins lectrical check result after insulator
is installed on water cap C.
pin 14 to 60kv bias has 20 Kohm @250V |
|
|
2687
|
Monday, September 23, 2024, 11:26 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 window line has been leak checked. | TM3 window line has been leak checked after
containment box removal and installation
for insulator installation on water cup C. |
|
|
2686
|
Wednesday, September 18, 2024, 13:47 |
David Wang | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Tm3 has been moved from silo to SHC. | Tm3 has been moved from silo to SHC.
The move is smooth. |
|
|
2685
|
Wednesday, September 18, 2024, 13:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Target removal | TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under |
13x |
|
2684
|
Tuesday, September 17, 2024, 13:42 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | Module Connection | TM4 with target TiC#9 is connected
in ITW. See attachment. |
|
|
2683
|
Tuesday, September 17, 2024, 11:16 |
David Wang | ITW | Standard Operation | TM4 | TiC#9 | TM4 has been moved from TCS to ITW. | TM4 has been moved from TCS to ITW. The
move is smooth. |
|
|
2682
|
Monday, September 16, 2024, 08:48 |
chad fisher | Manipulator Maintenance | Maintenance | | | CRL Technicain Manipulator Maitenance Trip | Over the course of September 9th - September
13, 2024 a CRL manipulator technician carried
out the following manipulator maintenance: |
|