  2481   Tuesday, August 29, 2023, 09:07 Frank SongITWRepairTM2Nb#11electrical check TM2 with new target Nb#11 replaced
has been electric checked one more time in
ITW.
 TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf 
  2480   Monday, August 28, 2023, 12:16 Frank SongNorth Hot-CellRepairTM2Nb#11electric/leak check TM2 with new target Nb#11 has been
E/L checked sitting on NHC.
 TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf 
  2479   Friday, August 25, 2023, 07:22 Frank SongITWRepairTM2Nb#10module disconnection TM2 with target Nb#10 was disconnected
in ITW yesterday for beam production issue
investigation.
 TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf 
  2478   Wednesday, August 23, 2023, 10:45 Travis CaveSpent Target VaultStandard Operation TiC#6Spent Target Move TiC #6 moved from north hot cell
to spent target vault placed in pail #232
put in spot 6A and the field was 151mSv/hr
 Target_Index_2023-08-23.pdf 
  2477   Tuesday, August 15, 2023, 13:58 Frank SongITWStandard OperationTM2Nb#10Module Connection TM2 with new target Nb#10 was moved
to ITW from TCS and re-connected in pit.
TPs are running at their full speed. 
 TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf 
  2476   Wednesday, August 09, 2023, 13:43 Carla BabcockNorth Hot-CellStandard OperationTM2TiC#6TiC#6 PIEPIE on TiC#6 was done in the NHC. The target
assembly looked brand new when we took it
out, no heating spots or deposits (pictures
  
  2475   Wednesday, August 09, 2023, 13:13 David WangConditioning StationStandard OperationTM2Nb#10Tm2 Nb#10 has been connect at TCS.TM2 Nb#10 has been connect at TCS. TCS
water system and vacuum system have been
started. Everything looks ok so far. TCS
  
  2474   Wednesday, August 09, 2023, 09:41 David WangNorth Hot-CellStandard OperationTM2Nb#10TM2 Nb# 10 electrical and leak check at NHCNb#10 has been installed on TM2 . electrical
and leak check on HS line are good. See attachment.
 Nb_#10_electrical_and_leak_check_at_NHC.pdf 
  2473   Tuesday, August 08, 2023, 13:01 David WangNorth Hot-CellStandard OperationTM2TiC#6TM2 TiC#6 post run electrical check at NHC.TM2 TiC#6 post run electrical check has
been done at TCS. See attachment
 TiC#6_post_run_electrical_check.pdf 
  2472   Tuesday, August 08, 2023, 12:59 David WangITWStandard OperationTM2SiC #6TM2 SiC#6 dhas been disconnected in ITWTM2 SiC#6 has been disconnected in ITW.
See check list
 TiC#6_TM2_disconnection_checklist.pdf 
  2471   Thursday, August 03, 2023, 12:24 Jason ZhangCraneDevelopment  Cleanup of camera installation on target hall crane, installation of replacement laser The cleanup of
the ISAC Target Hall crane and installation
 LaserProgramCalibrationLocation.pngSICK_Laser_Upgrade_Calibration.xlsxInstallation_IMG.png 
  2470   Tuesday, August 01, 2023, 09:06 Adam NewsomeCraneDevelopment  Measuring Tape and Camera Removed from Target Hall CraneIn an effort to clean up the camera installation
on top of the ISAC target hall crane to resolve
a fault, the position measuring tape and
  
  2469   Friday, July 28, 2023, 10:21 Adam NewsomeSpent Target VaultMaintenance  Mini Storage Vault: Bearing LubricationThe bearings on the mini storage vault
were lubricated. It is suspected that this
has never been done. It is suggested that
 PXL_20230728_162515733.jpg 
  2468   Friday, July 28, 2023, 10:09 Adam NewsomeSpent Target VaultMaintenance  Main Storage Vault: Bearing LubricationBearings for the main storage vault door
were lubricated on 2023-07-28. It is unknown
when this was last done. It is suggested
  
  2467   Tuesday, July 25, 2023, 16:25 Carla BabcockNorth Hot-CellStandard Operation SiC#45SiC#45 post irradiation inspectionLooked at SiC#45 in the hot cell. Looked
very clean, no deposits on the heat shield
or other components. Target also looked very
  
  2466   Wednesday, July 19, 2023, 08:09 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check An electrical check was made after
new target installed on TM4.
 E__check_after_UCx42_installed_on_TM4.pdf 
  2465   Wednesday, July 19, 2023, 08:04 Frank SongITEStandard OperationTM4UCx#42Module Connection TM4 with new target UCx#42 was connected
in ITE. 
 TM4_with_UCx42_connection_in_ITE_20230718.pdf 
  2464   Tuesday, July 18, 2023, 10:08 Frank SongNorth Hot-CellStandard OperationTM4SiC#45module disconnection & electrical check right after transferred from ITE to NHC TM4 with spent target SiC#45 was
disconnected ITE  and an electrical
check made right after moved on NHC. 
 TM4_with_SiC45_disconnection_and_e_check.pdf 
  2463   Wednesday, July 12, 2023, 22:21 Carla BabcockNorth Hot-CellStandard Operation TiC#5TiC#5 post irradiation inspection resultsThe TiC#5 post irradiation inspection was
done on Wed. June 14 and Mon. June 19. This
target didn't have any obvious issues but
  
  2462   Wednesday, June 21, 2023, 14:39 Adam NewsomeSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module ParkingAn annual electrical and mechanical inspection
was performed on the  SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle,
 PXL_20230621_210144119.MP.jpgPXL_20230621_210546559.jpgPXL_20230621_210146892.jpg 