Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2468     Entry time: Friday, July 28, 2023, 10:09
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Main Storage Vault: Bearing Lubrication 

Bearings for the main storage vault door were lubricated on 2023-07-28. It is unknown when this was last done. It is suggested that this be a recurring maintenance task every two years.

ELOG V2.9.2-2455