Message ID: 2469     Entry time: Friday, July 28, 2023, 10:21
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Mini Storage Vault: Bearing Lubrication 

The bearings on the mini storage vault were lubricated. It is suspected that this has never been done. It is suggested that this be performed every two years.

A draft procedure will be created for this job, but at a high level, this process involves:

  • Opening the door fully
  • Disconnection of the motor, limit switches, and cable management system
  • Attachment of a lifting magnet to the door itself
  • Raising the door
  • Lubricating bearings
  • Reversing the process to re-assemble

The entire job took less than 1 hour to complete.

 