2175
|
Monday, January 04, 2021, 12:13 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move | TM3 was remotely moved from the
South Hot Cell to the conditioning station.
No containment box. |
|
2174
|
Thursday, December 24, 2020, 09:00 |
Matthew Gareau | North Hot-Cell | Development | | | NHC USB connection | |
|
2173
|
Monday, December 21, 2020, 11:22 |
Adam Newsome | Crane | Standard Operation | | | Crane Shutdown for Power Outage | The Target Hall Crane has been shut down
in preparation for the power outage tomorrow
(Dec 22). Power will be restored on Dec 23. |
|
2172
|
Thursday, December 10, 2020, 15:07 |
Adam Newsome | South Hot-Cell | Development | TM3 | | TM3 Move | TM3 was remotely moved from the conditioning
station to the South Hot Cell. No containment
box. |
|
2171
|
Monday, December 07, 2020, 12:20 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move | TM3 has been moved from
the South Hot Cell to the
Conditioning Station. No containment box. |
|
2170
|
Wednesday, November 25, 2020, 09:05 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | Module Move | TM3 has been moved from
the Silo to the South Hot Cell. |
|
2169
|
Tuesday, November 24, 2020, 12:56 |
David Wang | ITW | Standard Operation | TM2 | Nb#9 | TM2 has been connected in ITW | TM2 has been connected to ITW. Turbo pumps
are stared. ITW pumping down is fine so far. |
|
2168
|
Tuesday, November 24, 2020, 09:37 |
Adam Newsome | ITW | Standard Operation | TM2 | | Module Move | TM2 has been moved from
the Conditioning Station to ITW. |
|
2167
|
Thursday, November 19, 2020, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | C#2 | Spent Target Move | C#2 has been moved from the south hot cell
to the spent target vault. It is in spot
8A of the vault in pail # 235 and was 185 |
|
2166
|
Thursday, November 19, 2020, 09:00 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#6 | Helium pressure check on TM2 HS line at TCS. | LD 0.0 Xe-9 atm.cc/sec , 70 psi helium
3 minutes. No leak. |
|
2165
|
Wednesday, November 18, 2020, 15:28 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Nb#6 | electrical check and HS leak check. | Everything looks good. A still short to
P before target installation. We will float
P,Q as before on module top. |
|
2164
|
Tuesday, November 17, 2020, 10:17 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | Module Move | TM2 has been moved from ITW to the South
Hot Cell.
|
|
2163
|
Thursday, November 12, 2020, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#31 | Spent Target Move | UC#31 has been moved from the south
hot cell to the spent target vault. It is
in spot 8B of the vault in pail # 224 and |
|
2162
|
Thursday, November 05, 2020, 10:48 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#61 | Module move | TM#4 with Ta#61 has been moved from
the south hot cell to the east target station. |
|
2161
|
Thursday, November 05, 2020, 10:23 |
David Wang | Spent Target Vault | Standard Operation | | | TM2 old source tray and TM4 optic tray in vault tray#9. | TM2 old source tray and TM4 optic tray
are stored together in vault tray#9. The
fielding measurement at SHC post 0.5 meter |
|
2160
|
Tuesday, November 03, 2020, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#31 | Module move | TM#4 with UC#31 has been moved from
the east target station to the south hot
cell. |
|
2159
|
Friday, October 30, 2020, 09:02 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48,51,54 SiC#35, and UC#25 | Repacking of the targets. | Targets Ta#48,51,54 SiC#35,
and UC#25 were repacked and placed in the
mini vault. In the following order back to |
|
2158
|
Tuesday, October 27, 2020, 11:46 |
Matthew Gareau | North Hot-Cell | Repair | | | Ratcheting repair issues with both left and right master |
|
|
2157
|
Tuesday, October 20, 2020, 10:14 |
Travis Cave | ITW | Standard Operation | TM2 | C#2 | Module move | TM#2 with C#2 has been moved from
the south hot cell to the West Target Station. |
|
2156
|
Monday, October 19, 2020, 12:52 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#2 | TM2 electrical and leak check at SHC | TM2 electrical check and leak check are
done at SHC with C#2 target installed. The
results are good. |
|