  1204   Monday, April 11, 2016, 10:07 Travis CaveSpent Target VaultStandard Operation UC#14Spent Target moveThe spent UC#14 target has been moved into
the ISAC spent target vault. See the attached
PDF for the details.
 Vault_Storage_April_11_2016.pdf 
  1203   Monday, April 11, 2016, 09:42 David WangConditioning StationStandard OperationTM4 Helium pressure test on TM4 HS line at CS with new Lp Ta target70 psi helium , 2 minutes. Base leak rate
0.0x E-9 atm.cc/sec. base pressure 0.0XE-4
torr. no response on LD.The line is good.
  
  1202   Friday, April 08, 2016, 13:16 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall ScheduleUpdate schedule weekly .see attachment
1,2
 2016_winter_shut_down__target_hall_schedule.mpp2016_winter_shut_down__target_hall_schedule.pdf 
  1201   Friday, April 08, 2016, 08:48 David WangITWStandard Operation  ITW water signal interlock check.I did a ITW water signals interlock check
with ISAC opp. They are checked once a year
before first beam on.
  
  1200   Friday, April 08, 2016, 08:13 Anders MjosITE/ITW CoolingMaintenance  High Active Water ResistivityThe high active water resistivity took
a long time to recover after the upgrade
to the water cooling circuit. The system
 2016-04-08_ISAC_High_Active_Water_Resistivity.png 
  1199   Friday, April 08, 2016, 07:13 David WangITWStandard OperationTM1UCx15TM1 has been connected in ITW.After ITW HV test is done, TM1 has been
connected to ITW. Water signals are checked
in electrical room. They are good.
  
  1198   Friday, April 08, 2016, 07:10 David WangConditioning StationStandard OperationTM4 TM4 vacuum has been connected in ITE.All turbo pumps are started yesterday.
The pumping down is good over night.
  
  1197   Thursday, April 07, 2016, 09:24 Travis CaveConditioning StationMaintenanceTM4Ta#47module movedTM#4 has been moved from the south hot
cell to the conditioning station.
  
  1196   Wednesday, April 06, 2016, 14:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#14, No Target, Ta#47Electrical CheckVarious electrical checks done on TM#4,
one of post beam UC#14, of no target and
with Ta#47. See PDFs for details.
 TM4_elec_chk_notgt_SHC.PDFTM4_elec_chk_Ta47_SHC.PDFTM4_elec_chk_UC14_SHC_postbeam.PDF 
  1195   Wednesday, April 06, 2016, 14:03 chad fisherSouth Hot-CellStandard OperationTM4Ta#47UCx#14 removed Ta#47 installedUCx#14 has been removed from TM4 and Ta#47
installed. No marks on 9 pin connector on
UCx#14.
  
  1194   Wednesday, April 06, 2016, 09:37 Travis CaveSouth Hot-CellStandard OperationTM4UC#14module movedTM#4 with UC#14 has been moved from the
east target station to the south hot cell.
  
  1193   Tuesday, April 05, 2016, 12:40 David WangITEStandard OperationTM4 I stopped ITE turbo pumps this morningThe ITE and TM4 have been vented with Argon
. TM4 vacuum system is disconnected in ITE.
  
  1192   Tuesday, April 05, 2016, 12:36 David WangITWStandard OperationTM1 TM1 vacuum system has been connected in ITW. All turbo -pumps are started.   
  1191   Tuesday, April 05, 2016, 09:33 Travis CaveITWStandard OperationTM1UC#15module movedTM#1 with UC#15 have been moved from the
conditioning station to the west target station.
  
  1190   Tuesday, April 05, 2016, 07:12 David WangConditioning StationStandard OperationTM1UC#15stop CS vacuum pumps.Stop TCS vacuum pumps . Preparing argon
venting on TM1 and TCS.
7:34 AM, Disconnected TM1 at TCS,
  
  1189   Monday, April 04, 2016, 11:14 David WangConditioning StationStandard OperationTM1 Helium pressure test on TM1 HS line at CSNew UCx target is installed on the module.
70psi helium,3 minutes. NO response on LD. 
LD is pumped to bottom LR and LP during test.
  
  1188   Friday, April 01, 2016, 14:41 David WangConditioning StationStandard OperationTM1 TM1 and TCS vacuum system has been connected. TCS control page white out.I can not start the TCS pumps due to control
page white out. Control group is working
on this issue.
  
  1187   Friday, April 01, 2016, 13:58 Travis CaveConditioning StationStandard OperationTM1UC#15module movedTM#1 has been moved from the conditioning
station to the south hot cell, had UC#15
installed and then moved back to the conditioning
  
  1186   Friday, April 01, 2016, 11:41 Travis CaveSouth Hot-CellStandard OperationTM1UC#15Electrical CheckElectrical check of the target on TM#1,
target in question is UC#15. See PDF for
details.
 TM1_elec_chk_UC#15_SHC.PDF 
  1185   Wednesday, March 30, 2016, 15:49 David WangAssembly/Bench TestRepairTM2  TM2 Helium spray leak check on solder stems inside service cap on the top of SW silo.On each water circuit in side the service
cap, there are 4 soldering stems which two
of them are inside blue nylon insulator and
 7x 