Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1193     Entry time: Tuesday, April 05, 2016, 12:40
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: I stopped ITE turbo pumps this morning 

The ITE and TM4 have been vented with Argon . TM4 vacuum system is disconnected in ITE.

ELOG V2.9.2-2455