Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1189     Entry time: Monday, April 04, 2016, 11:14
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number:  
Subject: Helium pressure test on TM1 HS line at CS 

New UCx target is installed on the module. 70psi helium,3 minutes. NO response on LD.  LD is pumped to bottom LR and LP during test.

ELOG V2.9.2-2455