Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1204     Entry time: Monday, April 11, 2016, 10:07
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: UC#14 
Subject: Spent Target move 

The spent UC#14 target has been moved into the ISAC spent target vault. See the attached PDF for the details.

Attachment 1: Vault_Storage_April_11_2016.pdf  52 kB  | Show | Hide all
ELOG V2.9.2-2455