Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1198     Entry time: Friday, April 08, 2016, 07:10
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: TM4 vacuum has been connected in ITE. 

All turbo pumps are started yesterday. The pumping down is good over night.

ELOG V2.9.2-2455