Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1187     Entry time: Friday, April 01, 2016, 13:58
Author: Travis Cave 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number: UC#15 
Subject: module moved 

TM#1 has been moved from the conditioning station to the south hot cell, had UC#15 installed and then moved back to the conditioning station.

ELOG V2.9.2-2455