Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1188     Entry time: Friday, April 01, 2016, 14:41
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number:  
Subject: TM1 and TCS vacuum system has been connected. TCS control page white out. 

I can not start the TCS pumps due to control page white out. Control group is working on this issue.

Control group fixed the white out problem. I started all turbo-pumps. The pumping down is good so far. The TM1 IG1 is broken. I will check it on next Monday. It could be a broken filament. Then, the filament will be replaced.

ELOG V2.9.2-2455