Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1196     Entry time: Wednesday, April 06, 2016, 14:52
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#14, No Target, Ta#47 
Subject: Electrical Check 

Various electrical checks done on TM#4, one of post beam UC#14, of no target and with Ta#47. See PDFs for details.

Attachment 1: TM4_elec_chk_notgt_SHC.PDF  154 kB  | Show | Hide all
Attachment 2: TM4_elec_chk_Ta47_SHC.PDF  141 kB  | Show | Hide all
Attachment 3: TM4_elec_chk_UC14_SHC_postbeam.PDF  144 kB  | Show | Hide all
ELOG V2.9.2-2455