37
|
Friday, February 21, 2014, 15:58 |
Bevan Moss | Cyclotron | Standard Operation | Old Monitor Box Removed, New installed | During the electrical test the was no contact.
To help investigate further the Montitor
box was removed from the Cyclotron. It was |
|
113
|
Wednesday, September 04, 2019, 15:29 |
Adam Newsome | Trolley | Maintenance | Connector faceplate and tubing upgrade | Tool Trolley:
The connector faceplate was replaced
with a new version to allow for more space |
|
114
|
Thursday, October 31, 2019, 14:31 |
Adam Newsome | Service Bridge | Repair | Outrigger 2 Vertical Drive Repair | Outrigger 2 vertical drive repair is complete
- ball screws were replaced to resolve a
jamming issue (this work was done in the |
|
116
|
Monday, February 03, 2020, 11:06 |
Adam Newsome | Cyclotron | Development | Porthole Cover Handling Tool - Initial Test Report | The suction-cup based porthole cover handling
tool (TRH1366) was tested for the first time
inside the cyclotron as part of the regular |
|
117
|
Wednesday, February 05, 2020, 12:37 |
Adam Newsome | Cyclotron | Development | Cyclotron Vacuum Cleaning Tool - Initial Test | The vacuum cleaning tool (TRH1366, vacuum
cleaning configuration) was tested in the
cyclotron tank. The following test were performed: |
|
118
|
Wednesday, February 05, 2020, 12:44 |
Adam Newsome | Cyclotron | Development | Cyclotron Small Object Retrival Tool - Intial Test | The small object retrieval tool was tested
in the cyclotron tank for the first time.
At this time, there are no known accessible |
|
119
|
Wednesday, February 05, 2020, 15:04 |
Adam Newsome | Trolley | Repair | Upper resonator trolley: cylinders for Ex 2C tasks | [B]Cylinder 4[/B] on the upper resonator trolley
was not fully functional when removing Ex
2C during 2020 shutdown. It worked occasionally. |
|
123
|
Thursday, July 16, 2020, 11:57 |
Adam Newsome | Cyclotron | Development | Cyclotron Mockup: Orbital Position Pendant Upgrade | The pendant used for controlling the orbital
motion of the bridge mockup was upgraded.
Features of the new pendant include: |
|
124
|
Thursday, November 05, 2020, 15:38 |
Adam Newsome | Infrastructure | Development | New crane pendant: B1 level crane | A new remote crane pendant was installed
to replace the existing wired pendant on
the B1 level of Remote Handling building |
|
125
|
Monday, November 09, 2020, 09:17 |
Adam Newsome | Infrastructure | Development | New crane pendant: B2 level crane | A new remote crane pendant was installed
to replace the existing wired pendant on
the B2 level of Remote Handling building |
|
126
|
Wednesday, January 13, 2021, 11:35 |
Adam Newsome | Shielding | Maintenance | Shadow Shields Inspection - 2021 Shutdown | All shadow shields which are remotely placed
inside the cyclotron during shutdown were
inspected by Adam Newsome and Chris Peterson |
|
127
|
Friday, January 22, 2021, 14:30 |
Adam Newsome | Cyclotron | Standard Operation | Lid up operation - 2021 | The lid
up operation took place on Jan. 22, 2021.
The |
|
128
|
Wednesday, February 03, 2021, 12:37 |
Adam Newsome | Cyclotron | Development | Ladder Handling Tool - First In-Tank Test (SAS0824) | The newly developed Ladder Handling Tool
(TRH1401), which is used to move the maintenance
ladders from the #5 resonator area closer |
|
129
|
Friday, February 26, 2021, 08:29 |
Adam Newsome | Trolleys serviced | Maintenance | First Turn Radial Flag (FTRF) Jig - Pneumatic Upgrade | Old fittings and broken pneumatic tubing
on the FTRF jig have been replaced with new
push-connect fittings and polyurethane tubing. |
|
130
|
Friday, February 26, 2021, 13:00 |
Adam Newsome | Trolleys serviced | Maintenance | Lower Resonator Trolley - Radial Drive Failure Issue | On Feb. 24 while practising a training
exercise, the lower resonator trolley unexpectedly
experienced a radial drive failure. The trolley |
|
131
|
Thursday, April 01, 2021, 13:47 |
Adam Newsome | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door has been closed and
seal inflated. The operation was performed
with no issue. |
|
132
|
Tuesday, April 20, 2021, 15:02 |
Adam Newsome | Carrier | Development | Emergency Trolley Rescue Winch: Installed and Tested | An emergency trolley rescue winch (TRH1527)
was developed for the purposes of retrieving
trolleys from the cyclotron tank whose radial |
|
133
|
Wednesday, May 05, 2021, 12:20 |
Adam Newsome | Infrastructure | Development | Cyclotron RH Control Room: Outlets Installed | The following outlets were installed by
Electrical Services Group in order to facilitate
upgrading power supplies for Cyclotron Remote |
|
134
|
Wednesday, June 16, 2021, 09:59 |
Adam Newsome | Service Bridge | Development | Bridge Lift Mechanism Refurbishment (Phase 1 of 2) - Complete | The following items from Phase 1 of 2 of
Bridge Lift Mechanism Refurbishment (O504)
are complete: |
|
135
|
Tuesday, August 31, 2021, 14:28 |
Adam Newsome | Trolleys serviced | Development | Upper Resonator Trolley - Finger Cylinders Replaced | The two support fingers on the upper resonator
trolley were bent due to excessive loading
during cylinder toggling. |
|