186
|
Tuesday, July 23, 2024, 13:27 |
Riley Sykes | Carrier | Maintenance | Service/Maintenance checks | 1,2, 5 Year Service and maintenance
package completed on Carrier. All reducers
repacked with Molub-Alloy 777-1 ES grease. |
|
188
|
Wednesday, July 24, 2024, 14:26 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7R pulled apart and inspected
for deficiencies, all parts deemed to be
in working order, jack was rebuilt and lubricated |
|
189
|
Wednesday, August 07, 2024, 14:24 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7L pulled
apart and inspected for deficiencies, alignment |
|
196
|
Friday, January 31, 2025, 13:41 |
Riley Sykes | Elevation Jack | Maintenance | Spare Highfield units 13L/R | Both spare #13 Highfields inspected
and serviced. New oil added Jan 30 2025.
All in working order and ready for operation |
|
198
|
Tuesday, February 25, 2025, 12:00 |
Riley Sykes | Elevation Jack | Maintenance | Highfield 5 L/R | Both Highfields from unit 5 have
been removed, serviced and new lubrication
added. 5R Worm Wheel has intermittent pitting |
  |
200
|
Wednesday, March 26, 2025, 10:07 |
Riley Sykes | Elevation Jack | Maintenance | Screwjack 5 L/R | Both L and R of screwjack sets #5
have been inspected, serviced and lubricated.
All in working order, no deficiencies present |
|
142
|
Tuesday, May 10, 2022, 11:26 |
Nadia Jorgenson | Cyclotron | Repair | Festooning rail rope and pulley system re-routed | The rope and pulley system that is used
to raise the festooning rail across the vault
shield door has been re-routed. It now makes |
|
143
|
Tuesday, May 10, 2022, 11:30 |
Nadia Jorgenson | Cyclotron | Repair | Cracked Festooning Rail Bushing Removed | We removed the left bushing that
is around the air cylinder on the festooning
rail, right outside the cyclotron. It was |
|
144
|
Tuesday, May 10, 2022, 11:31 |
Nadia Jorgenson | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door
has been closed and seal inflated. The operation |
|
151
|
Tuesday, March 28, 2023, 12:02 |
Nadia Jorgenson | Service Bridge | Repair | Outrigger 1 Failure and Repair |
During
the 2023 shutdown outrigger 1 failed. While |
|
160
|
Tuesday, November 14, 2023, 12:13 |
Nadia Jorgenson | Service Bridge | Repair | First Festooning Car "H" channel replacement | Damaged "H" channel removed
from the first festooning car, and spare
channel was put in place. |
 |
161
|
Tuesday, November 14, 2023, 12:38 |
Nadia Jorgenson | Service Bridge | Maintenance | Bridge Orbit Counter Work in 2023 | All the bearings on both
the upper and lower wheel were replace to |
|
103
|
Monday, January 08, 2018, 09:04 |
Maico Dalla Valle / Jason Kapalka | Cyclotron | Standard Operation | Cyclotron Lid Up | Remote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
|
|
1
|
Monday, June 27, 2011, 10:38 |
John Wong | General | Routine | Testing RH elog | |
|
156
|
Thursday, September 07, 2023, 13:21 |
Jason Zhang | Service Bridge | Development | Outrigger #1 and #2 individual testing complete | Outrigger #1 and #2 have had their controls
system overhauled as part of the O503 project.
The previous controls enclosure and the elements |
|
159
|
Wednesday, October 18, 2023, 12:35 |
Jason Zhang | Service Bridge | Development | O503 Bridge and Outrigger integration testing | Service bridge, Outrigger #1, and
Outrigger #2 have had the controls system
migrated to PLC controls. The 5069-AENTR |
|
92
|
Monday, February 06, 2017, 20:32 |
Jason Kapalka | Elevation Jack | Maintenance | 2017 Cyclotron Elevating System Maintenance | The Cyclotron Elevating System planned maintenance
work this year was performed on Jack Station
#3, #8, #9, and #10.
|
|
95
|
Tuesday, February 28, 2017, 15:45 |
Jason Kapalka | Cyclotron | Standard Operation | 2C extraction probe removal and reinstallation | 2C extraction probe was removed from cyclotron
tank on 2017-02-07 by RH and Probes group
members with service
|
|
96
|
Friday, March 03, 2017, 13:30 |
Jason Kapalka | Cyclotron | Standard Operation | CP continuity test | Performed continuity test at Cyclotron center
post with RH and Operations group members
using the service bridge,
|
|
97
|
Tuesday, March 07, 2017, 09:31 |
Jason Kapalka | Shielding | Standard Operation | Blockers/Shields/Covers/Ladders | The seven copper blockers were removed from
the Cyclotron tank by the RH group using
the service bridge, lift
|
|