Wednesday, March 26, 2025, 10:07, Riley Sykes, Elevation Jack, Maintenance, Screwjack 5 L/R
|
Both L and R of screwjack sets #5 have been inspected, serviced and lubricated. All in working order, no deficiencies present and ready for next
service installation. |
Friday, March 21, 2025, 11:13, Adam Newsome, Cyclotron, Standard Operation, Lid down operation - 2025 
|
The lid down operation took place on March 21, 2025 [slightly ahead of schedule].
|
Tuesday, February 25, 2025, 12:00, Riley Sykes, Elevation Jack, Maintenance, Highfield 5 L/R  
|
Both Highfields from unit 5 have been removed, serviced and new lubrication added. 5R Worm Wheel has intermittent pitting range 1mm -5mm large
along tailing edge, possibly from original run up. After discussion unit was deemed acceptable for continued use. May need wheel replacement within a 5
year range or if abnormalities present themselves during duty. see attached photos. |
Wednesday, February 19, 2025, 15:29, Adam Newsome, Cyclotron, Development, Lift Trolley - upgraded controls commissioning complete
|
Newly implemented PLC-based controls hardware and software for the Lift Trolley was commissioned between January 30 - February 7, 2025, mostly under
work permit C2025-01-30-3.
|
Friday, January 31, 2025, 13:41, Riley Sykes, Elevation Jack, Maintenance, Spare Highfield units 13L/R
|
Both spare #13 Highfields inspected and serviced. New oil added Jan 30 2025. All in working order and ready for operation when required. |
Tuesday, January 28, 2025, 12:31, Adam Newsome, Elevation Jack, Standard Operation, Lid up operation - 2025 
|
The lid up operation took place on Jan. 28, 2025 under work permit C2025-01-28-1
|
Monday, January 20, 2025, 13:55, Adam Newsome, Elevation Jack, Maintenance, Elevating System MRO - 2025  
|
Elevating System MRO was started Jan. 16 by R. Sykes, M. Dalla Valle, P. Hall-Patch under work permit C2025-01-16-3.
The plan for this year includes:
Remove station 5 from service and move to shop for maintenance
Remove station 7 (spare) and move to station 5
|
Monday, January 06, 2025, 13:57, Adam Newsome, Infrastructure, Standard Operation, Safety Walkaround Complete - RH Building Shop and Back Shop
|
A safety walkaround was completed for the RH building shop and back shop.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Friday, January 03, 2025, 10:20, Adam Newsome, Infrastructure, Standard Operation, Safety Walkaround Complete - RH Building B1 and B2 Level
|
A safety walkaround was completed for the RH building B1 and B2 levels.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Wednesday, October 16, 2024, 11:37, Adam Newsome, Service Bridge, Development, Bridge Lift Mechanism Refurbishment (Phase 2 of 2) - Complete 6x
|
See previous e-log for phase 1: e-log 134
Phase 2 of the bridge lift mechanism refurbishment was completed. The scope of work for this phase includes replacement of the hydraulic pump (including |
Thursday, October 10, 2024, 12:30, Adam Newsome, Infrastructure, Standard Operation, Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels
|
A safety walkaround was completed for the RH Shop, Back Shop, B1, and B2 levels.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Wednesday, August 07, 2024, 14:24, Riley Sykes, Elevation Jack, Maintenance, Service inspection and relubrication
|
Jack 7L pulled apart and inspected for deficiencies, alignment monitored with prussian
blue and deemed acceptable wear. All parts in working order, jack was rebuilt and lubricated with Molub-Alloy 777-1 ES. Fully operational for next shutdown
period swap. |
Wednesday, July 24, 2024, 14:26, Riley Sykes, Elevation Jack, Maintenance, Service inspection and relubrication
|
Jack 7R pulled apart and inspected for deficiencies, all parts deemed to be in working order, jack was rebuilt and lubricated with Molub-Alloy
777-1 ES. Jack is deemed fully operational for next swap. |
Wednesday, July 24, 2024, 11:39, Adam Newsome, Cyclotron, Standard Operation, Investigation of faulty Al-ALCW signal
|
Fault 16710 was initially assigned to Remote Handling: IBOP0206 giving false positive - Al-ALCW water pressure shows "off" when it isn't; The safety system
is reporting that Al-ALCW water pressure is "off" (page SVG) when the system is still on and at normal operating pressure. |
Tuesday, July 23, 2024, 13:27, Riley Sykes, Carrier, Maintenance, Service/Maintenance checks
|
1,2, 5 Year Service and maintenance package completed on Carrier. All reducers repacked with Molub-Alloy 777-1 ES grease. Main drive train and
all bearings relubricated. No issues. Operational. |
Wednesday, July 17, 2024, 15:02, Adam Newsome, Infrastructure, Standard Operation, Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels
|
A safety walkaround for July 2024 was completed for the B1 and B2 levels by A. Newsome, and for the main shop and back shop by R. Sykes.
Results can be found in the master
spreadsheet |
Monday, June 24, 2024, 12:53, Riley Sykes, Elevation Jack, Maintenance, Highfield Service
|
Highfields 7A,7B post shutdown service complete. Oil change completed, new Mobil 600 W Super Cylinder oil added. Sample collected for RPG of used
oil. Both found to be mechanically sound and stored in upper mezzanine. |
Friday, June 14, 2024, 10:04, Riley Sykes, Service Bridge, Maintenance, Service/ Bridge inspection
|
Yearly, 2 Year and 5 Year service completed. All bearings on support frames turn freely and were regreased with Molub Alloy 777-1 ES. Reducer repacked
as well. Reinspect pre shutdown and lubricate orbital drive chain before wiping off excess. |
Wednesday, June 12, 2024, 10:35, Riley Sykes, Trolleys serviced, Maintenance, Outriggers 1 and 2 Service
|
1,2 and 5 Year service completed. Vertical ball screws and chains inspected and regreased with Chemours Krytox EG 2000 suitable for vacuum and
clean room situations. Mechanically sound, will do a once over before next shutdown period. |
Tuesday, June 04, 2024, 14:29, Riley Sykes, Trolleys serviced, Maintenance, Lower Resonator Trolley
|
12, 24 and 60
month service completed. Bearings for drive motor wheels regreased and observed to move freely without load. Reducers repacked with Molub Alloy 777-1
ES. Vertical ball screw scissor mechanism inspected and all operations observed to be in sound mechanical condition. |
|