193
|
Monday, January 06, 2025, 13:57 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building Shop and Back Shop | A safety walkaround was completed for the
RH building shop and back shop.
The resulting spreadsheet can be |
|
|
192
|
Friday, January 03, 2025, 10:20 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building B1 and B2 Level | A safety walkaround was completed for the
RH building B1 and B2 levels.
The resulting spreadsheet can be |
|
|
191
|
Wednesday, October 16, 2024, 11:37 |
Adam Newsome | Service Bridge | Development | Bridge Lift Mechanism Refurbishment (Phase 2 of 2) - Complete | See previous e-log for phase 1: e-log
134
|
6x |
|
190
|
Thursday, October 10, 2024, 12:30 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround was completed for the
RH Shop, Back Shop, B1, and B2 levels.
The resulting spreadsheet can be |
|
|
189
|
Wednesday, August 07, 2024, 14:24 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7L pulled
apart and inspected for deficiencies, alignment |
|
|
188
|
Wednesday, July 24, 2024, 14:26 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7R pulled apart and inspected
for deficiencies, all parts deemed to be
in working order, jack was rebuilt and lubricated |
|
|
187
|
Wednesday, July 24, 2024, 11:39 |
Adam Newsome | Cyclotron | Standard Operation | Investigation of faulty Al-ALCW signal | Fault 16710 was initially assigned
to Remote Handling: |
|
|
186
|
Tuesday, July 23, 2024, 13:27 |
Riley Sykes | Carrier | Maintenance | Service/Maintenance checks | 1,2, 5 Year Service and maintenance
package completed on Carrier. All reducers
repacked with Molub-Alloy 777-1 ES grease. |
|
|
185
|
Wednesday, July 17, 2024, 15:02 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround for July 2024 was completed
for the B1 and B2 levels by A. Newsome, and
for the main shop and back shop by R. Sykes. |
|
|
184
|
Monday, June 24, 2024, 12:53 |
Riley Sykes | Elevation Jack | Maintenance | Highfield Service | Highfields 7A,7B post shutdown service
complete. Oil change completed, new Mobil
600 W Super Cylinder oil added. Sample collected |
|
|
183
|
Friday, June 14, 2024, 10:04 |
Riley Sykes | Service Bridge | Maintenance | Service/ Bridge inspection | Yearly, 2 Year and 5 Year service
completed. All bearings on support frames
turn freely and were regreased with Molub |
|
|
182
|
Wednesday, June 12, 2024, 10:35 |
Riley Sykes | Trolleys serviced | Maintenance | Outriggers 1 and 2 Service | 1,2 and 5 Year service completed.
Vertical ball screws and chains inspected
and regreased with Chemours Krytox EG 2000 |
|
|
181
|
Tuesday, June 04, 2024, 14:29 |
Riley Sykes | Trolleys serviced | Maintenance | Lower Resonator Trolley | 12, 24 and 60 |
|
|
180
|
Monday, June 03, 2024, 14:29 |
Riley Sykes | Trolleys serviced | Maintenance | Upper Resonator Trolley | 24 Month, 60 month
service completed. Bearings for drive motor |
|
|
179
|
Friday, May 31, 2024, 12:47 |
Riley Sykes | Trolleys serviced | Maintenance | Tool Trolley Scheduled Maintenance | 60 month service completed. Bearings
for drive motor wheels regreased, Reducer
repacked with Molub Alloy 777-1 ES, |
|
|
178
|
Friday, May 31, 2024, 11:28 |
Riley Sykes | Service Bridge | Maintenance | Outrigger mechanical inspection | Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit |
|
|
177
|
Friday, May 31, 2024, 08:57 |
Riley Sykes | Carrier | Maintenance | Carrier Drive motor/gear reducer | Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder |
|
|
176
|
Thursday, May 16, 2024, 12:33 |
Riley Sykes | Service Bridge | Maintenance | Center Post Bearing | Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES |
|
|
175
|
Tuesday, May 14, 2024, 10:53 |
Riley Sykes | Carrier | Maintenance | Carrier underrail wheels maintenance | All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set. |
|
|
174
|
Tuesday, May 07, 2024, 09:35 |
Adam Newsome | Elevation Jack | Standard Operation | Lid down operation (third) - 2024 | A third lid down
operation took place over May 6-7, 2024. |
|