Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines, Page 6 of 7  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Category Type Subject Text Attachments
  106   Thursday, July 27, 2017, 09:02 Keith C NgPrimary BeamlinesDevelopmenttesttest   
  107   Tuesday, January 23, 2018, 15:44 Keith C NgPrimary BeamlinesRepair1AQ15 insulator repairAssisted beamlines in replacing 2 insulators
on 1A Q15 magnet. #10 and #14 insulators
were found to be leaking at the ceramic,
 vlcsnap-00001.jpgvlcsnap-00002.jpg20180123_1aq15repair_P1030875.JPG20180123_1aq15repair_P1030880.JPG 
  108   Wednesday, January 31, 2018, 15:28 Keith C NgPrimary BeamlinesRepairQ15 repairBeamlines has changed out another 2 insulators
on Q15 after discovering two additional leaks.
Insulators #2 & #4 were replaced. One
  
  109   Thursday, February 01, 2018, 15:44 Keith C NgPrimary BeamlinesRepairq15 repairCorrection that all supply side (even numbered
insulators) ceramic insulators on Q15 have
been replaced with new old stock insulators
  
  110   Monday, February 05, 2018, 15:40 Keith C NgPrimary BeamlinesRepair1A Q15 repair.1.) Completed covering up 1A Q15.
2.) RH flask currently contains the
8 insulators removed from Q15. 3.6 mSv/h
 20180205_1aq15repair_P1030889.JPG 
  111   Wednesday, February 14, 2018, 10:36 Keith C NgPrimary BeamlinesRepair1a q12 q13Uncovered and placed bridges for 1a q12
q13 for doug's re cabling work. See WP C2018-02-13-2:
work
 P1030907.JPG 
  112   Tuesday, March 13, 2018, 15:36 Keith C NgM9Standard Operationm9 alignment workSet up shielding canyon for M9 laser tracker
job.
 dms.jpg 
  113   Thursday, March 15, 2018, 15:48 Keith C NgM9Maintenancem9 t2 alignment jobBlank off removed this morning, video recorded
the T2 flange,B1 flange and B1 vacuum box
interior. Blank off is 150 uSv/h @ .5m, 3
  
  114   Friday, March 16, 2018, 13:39 Keith C NgM9Maintenancet2 m9 port inspectionVideo imaged T2 port post blank off removal,
looks roughly the same as last year. Knife
edge looks clean.
 2018_t2m9flangeinspection2.jpg2017_t2m9flangeinspection.jpg 
  115   Wednesday, March 21, 2018, 15:22 Keith C NgM9Repairt2 m9 laser tracker jigsInstalled the remaining laser tracker jigs
for beam lines. No issues. Made sure 8"
target the mounting poles did not interfere
 20180321_t2m9_P1030966.JPG20180321_t2m9_P1030967.JPG20180321_t2m9_P1030968.JPG 
  116   Monday, March 26, 2018, 15:57 Keith C NgM9Maintenancet2 m9 laser tracker alignmentRemoved all Leica tracker targets from
M9 pit, I will proceed with blanking off
T2 exit port sometime this week. Alignment
  
  117   Tuesday, March 27, 2018, 15:08 Keith C NgM9Standard Operationt2 m9 port blank off1.
Blank off installed 11:40      with Dan McDonald,
east spring ear looks 'deeper" than
 20180327_t2m9_P1030978.JPG20180327_t2m9_P1030979.JPG 
  118   Thursday, March 29, 2018, 15:15 Keith C NgM9Maintenancet2 m9 port blank offToday leak checked the M9 exit port with
Edi and we found no leaks. The usual delayed
helium response in the M20/Collimator B/
  
  120   Thursday, April 25, 2019, 11:13 Keith C NgM20RepairM20 Q2 repair notesSee attached scan for repair notes regarding
M20 Q2 during the 2019 winter shutdown. The
repair method for M20 Q2 was instigated by
 2019_shutdown_m20_q2_repair_notes.pdf 
  121   Tuesday, June 11, 2019, 14:56 Keith C NgM9DevelopmentM9 B1 seal notes from 1988 Found original installation notes
for the initial installation of M9 Q1Q2 generation
2 in 1988.
 m9_b1_seal_deans_notes_page_1.pdfM9_B1_seal_Deans_Notes_Page_2.pdf 
  122   Tuesday, September 24, 2019, 14:37 Keith C NgPrimary BeamlinesStandard Operationlead pig radiation surveySurveyed contents of storage flask located
at TNF. The lid was lifted off roughly 12"
up and a pole monitor was swept over the
  
  123   Thursday, October 24, 2019, 14:41 Keith C NgPrimary BeamlinesMaintenanceannotated drawing of 1A Q15 cooling headers Annotated drawing of TBP0425D attempting
to capture the repairs of 1A Q15 triplet
magnet ceramic insulator/coils over the years.
 tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-repairannotations.pdf 
  124   Monday, February 24, 2020, 15:13 Keith C NgM9Repairm9 q1q2 repair laser tracker shootBeamlines
shot the position of the M9 T2 port and B1
flange for setting the M9 test stand flanges
 20200224_m9project_P1040686.JPG20200224_m9project_P1040688.JPG 
  125   Friday, March 06, 2020, 13:36 Keith C NgM9RepairM9 B1 moved to warm cell The M9 B1 was removed from the M9
channel surveyed and moved to the remote
handling warm cell for refurbishment.
 2020_M9_B1_field_survey_out_of_channel.pdf 
  126   Thursday, March 19, 2020, 15:42 Keith C NgPrimary BeamlinesDevelopmentVault beamline beam position monitorThe Beam Position Monitor between 1VB1
and 1VM3 has been installed. The indium joints
are leak tight, however the V flanges are
  
ELOG V2.9.2-2455