  110   Monday, February 05, 2018, 15:40 Keith C NgPrimary BeamlinesRepair1A Q15 repair.1.) Completed covering up 1A Q15.
2.) RH flask currently contains the
8 insulators removed from Q15. 3.6 mSv/h
 20180205_1aq15repair_P1030889.JPG 
  109   Thursday, February 01, 2018, 15:44 Keith C NgPrimary BeamlinesRepairq15 repairCorrection that all supply side (even numbered
insulators) ceramic insulators on Q15 have
been replaced with new old stock insulators
  
  108   Wednesday, January 31, 2018, 15:28 Keith C NgPrimary BeamlinesRepairQ15 repairBeamlines has changed out another 2 insulators
on Q15 after discovering two additional leaks.
Insulators #2 & #4 were replaced. One
  
  107   Tuesday, January 23, 2018, 15:44 Keith C NgPrimary BeamlinesRepair1AQ15 insulator repairAssisted beamlines in replacing 2 insulators
on 1A Q15 magnet. #10 and #14 insulators
were found to be leaking at the ceramic,
 vlcsnap-00001.jpgvlcsnap-00002.jpg20180123_1aq15repair_P1030875.JPG20180123_1aq15repair_P1030880.JPG 
  106   Thursday, July 27, 2017, 09:02 Keith C NgPrimary BeamlinesDevelopmenttesttest   
  105   Thursday, March 16, 2017, 15:50 Keith C NgPrimary BeamlinesRepaircollimator b transition to t2On Monday found leaking joint was the ring
directly downstream of T2. Vacuum group has
been spraying Vacseal (http://www.vacseal.net/Pages/default.aspx)
 20170316_collimatorb_RHB_8023.JPG20170316_collimatorb_RHB_8025.JPG 
  104   Wednesday, March 08, 2017, 16:05 Keith C NgPrimary BeamlinesRepaircollimator joint repairStarted uncovering the area above the T2
to Q13 joint:
 
 t2m920170308_114226_1136.jpgt2m920170308_151426_1438.jpg 
  103   Monday, February 20, 2017, 15:58 Keith C NgM9Developmentt2 m9 job wrap upRestored shielding to T2 M9 void, blocks
seem more crooked compared to previous years.
 20170220_t2m9alignment_P1030616.JPG20170220_t2m9alignment_P1030621.JPG 
  102   Friday, February 17, 2017, 13:33 Keith C NgM9DevelopmentT2 M9 vacuumLeak checked the blank off at T2 M9 exit
port with Dimo Y. and Edi D.V. (Vac Group)
and they confirm it is leak tight. Blank
  
  101   Wednesday, February 15, 2017, 15:36 Keith C NgM9Developmentt2 m9 blank offInstalled the blank off on the T2
M9 exit port:
 20170215_shutdown_log_photos.pdf 
  100   Tuesday, February 14, 2017, 16:08 Keith C NgM9DevelopmentT2 M9 2015 vs 2017 comparisonAttached a quick comparison of M9 exit
port flanges WRT indium remnants: looks roughly
the same. Will attempt to install blanking
 20170214_t2m9alignmentflangecomparison.pdf 
  99   Friday, February 10, 2017, 15:53 Keith C NgM9Developmentt2 m9 jobInstalled all jigs and Alignment group
did their shoots successfully. Used individual
pins on the 15" target jig and worked
 20170210_t2m9alignment_P1030604.JPG 
  98   Thursday, February 09, 2017, 16:14 Keith C NgM9Developmentt2 m9 alignmentPrepared m9 and b1 flanges for accepting
their target jigs. The target jigs need to
be reset by alignment group, 15" was
 20170209_t2m9alignment_P1030588.JPG20170209_t2m9alignment_P1030586.JPG 
  97   Tuesday, February 07, 2017, 15:36 Keith C NgM9Developmentt2 m9 job - Removed blank off from t2 m9 port,
had to pry off with screw driver via spring
ears. Clean removal it seems.
 20170207_rh_shutdown_log.pdf 
  96   Friday, February 03, 2017, 14:57 Keith C NgM9DevelopmentRemoving shield blocks and leak check results.Removed temporary shielding blocks from
M9 hole and placed in temporary bunker. Capped
with 18' shielding block. Blank off ready
 t2m920170203_140114_0604.jpgt2m920170203_120314_0686.jpgLocal_leak_check_Jan_27_2017.pdf 
  95   Wednesday, February 01, 2017, 15:34 Keith C NgM9DevelopmentT2 M9 SetupFinished setting up work area around T2
M9 front end.
 
 t2m920170201_143714_1032.jpg 
  94   Monday, January 30, 2017, 12:01 Keith C NgM9DevelopmentT2 leak check with vac groupWeek
of Jan 23 to 27:
 
  
  93   Thursday, March 31, 2016, 15:32 Keith C NgPrimary BeamlinesDevelopment1VM3 to 1VQ4 joint.Re-installed indium vacuum joint for 1VQ4,
routing installation. R. Kuramoto sprayed
silicone grease on to the threads and bushings
  
  92   Wednesday, March 16, 2016, 17:57 Ron KuramotoPrimary BeamlinesDevelopment4VQ1&Q2 Removal On 14March2016, 4VQ1&Q2 were
removed from BL4V and lowered into the Vault
basement B3 level where they were stored
 13x 
  91   Wednesday, March 16, 2016, 17:19 Ron KuramotoPrimary BeamlinesDevelopment4VQ3 Removal On 8March2016, under W/P C2016-03-08-2,
4VQ3 was lifted out of BL4V with the vault
orbit crane where it was first weighed then
 IMG_1893.JPGIMG_1893.JPGIMG_1899.JPGIMG_1902.JPGIMG_1907.JPG 