Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines, Page 2 of 7  Not logged in ELOG logo
  ID Date Author Categorydown Type Subject Text Attachments
  59   Wednesday, January 14, 2015, 11:00 Keith C NgPrimary BeamlinesMaintenance1VQ4 & 1VQ6 beamtube removal (WR #2686)Disconnected and removed beam tube from
1VQ4, 5, 6.  
  
  60   Friday, January 23, 2015, 15:21 Keith C NgPrimary BeamlinesMaintenance1VQ4 joint section (WR #2686) 1VQ4 & 1VQ6 beamtube was installed
by UCN group. RH provisonally installed aluminum
indium carrier ring with no indium into joint
 20150123_ucnbuild_IMG_1197.JPG20150123_ucnbuild_IMG_1202.JPG20150123_ucnbuild_IMG_1205.JPG20150123_ucnbuild_IMG_1207.JPG20150123_ucnbuild_IMG_1209.JPG 
  61   Tuesday, February 03, 2015, 16:35 Keith C NgPrimary BeamlinesDevelopmentUCN T1 shutdown workRH bridge has been set up over T1 to Q1Q2
area, see images for radiation survey of
work area. Joint is still intact, work will
 INBOX)3363.jpegINBOX)33632.jpeg 
  62   Wednesday, February 04, 2015, 16:12 Keith C NgPrimary BeamlinesDevelopmentUCN T1 shutdown workUCN T1 work continues:
- Retracted Q1 T1 pindrive, took
34.5 turns. Pins left bolted to T1 monument.
  
  63   Thursday, February 05, 2015, 16:06 Keith C NgPrimary BeamlinesDevelopmentT1 Q1Q2 blank off workWork continues on T1 M13Q1 joint:
- Discovered some sort of vacuum
box brace restricting the collapse of the
 20150205_ucnbuild_IMG_1229.JPG20150205_ucnbuild_IMG_1228.JPG20150205_ucnbuild_IMG_1225.JPG0temp_bellowsblocker.JPG 
  64   Friday, February 06, 2015, 16:01 Keith C NgPrimary BeamlinesDevelopmentT1 M13Q1Q2 blank off workT1 M13Q1Q2 work continued:
- Removed T1 Q1 indium seal ring,
collapsed center vacuum box bellows using
 20150206_ucnbuild_IMG_1242.JPG20150206_ucnbuild_IMG_1241.JPG20150206_ucnbuild_IMG_1238.JPG20150206_ucnbuild_IMG_1236.JPG 
  65   Tuesday, February 10, 2015, 16:15 Keith C NgPrimary BeamlinesDevelopmentT1 Q1Q2 blank off workRH beam line work for UCN continues at
T1.
- Attempted to scrape t1 flange,
 20150210_ucnbuild_IMG_1244.JPGvlcsnap-00014.jpg 
  66   Wednesday, February 11, 2015, 16:46 Keith C NgPrimary BeamlinesDevelopmentT1 M13Q1Q2 blank off workwork continues on T1 M13 area for UCN.
- He leak checked T1 M13Q1 joint
(sealed with rubber) and surrounding uncovered
 vlcsnap-00010.jpgvlcsnap-00013.jpg20150211_ucnbuild_IMG_1258.JPG20150211_ucnbuild_IMG_1253.JPG 
  67   Thursday, February 12, 2015, 14:29 Keith C NgPrimary BeamlinesDevelopmentT1 M13Q1Q2 blank off workRemoved M13 B1 magnet from beam line without
issues, Q2 vacuum box is covered with bag
and vacuum box "extended" with
 20150212_ucnbuild_IMG_1266.JPG20150212_ucnbuild_IMG_1268.JPG20150212_ucnbuild_IMG_1271.JPG20150212_ucnbuild_IMG_1275.JPG 
  68   Friday, February 13, 2015, 15:10 Keith C NgPrimary BeamlinesDevelopmentIVM3-IVQ4 indium joint section (WR #2686)Installed 4" indium seal at 1VM3 to
IVQ4. No real problems with installation.
 
 20150213_ucnbuild_IMG_1304.JPG20150213_ucnbuild_IMG_1305.JPG20150213_ucnbuild_IMG_1308.JPG 
  69   Tuesday, February 17, 2015, 16:02 Keith C NgPrimary BeamlinesDevelopmentM13Q1Q2 vacuum box anchor (part of UCN work)The replacement pin drive anchor (see TB22300)
for M13 Q1Q2 vacuum box lowered into initial
position. The original B1 base plate was
  
  70   Friday, February 20, 2015, 16:28 Keith C NgPrimary BeamlinesDevelopmentM13Q1Q2 vacuum box anchor (part of UCN work)Installed Q1Q2 pin drive and attempted
to align it to the vacuum box. Spent majority
of the day trying to align the pin drive/anchor.
  
  71   Monday, February 23, 2015, 15:57 Keith C NgPrimary BeamlinesDevelopmentM13Q1Q2 blank off (part of UCN work)"Hector" shield block installed
into place, Q1Q2 Vacuum box still actuates
normally. It does not appear that the position
  
  72   Wednesday, February 25, 2015, 14:57 Keith C NgPrimary BeamlinesDevelopmentT1 M13Q1Q2 blank off workBlanking plate with indium between T1 and
M13Q1 flange has been installed, joint will
be He leak checked tomorrow. Vac group informs
 20150225_vlcsnap00010.jpg 
  73   Thursday, February 26, 2015, 16:22 Keith C NgPrimary BeamlinesDevelopmentM13Q1Q2 blank off (part of UCN work)He leak checked T1M13Q1 joint, is leak
tight.
 - Detected a small leak in
  
  74   Thursday, March 05, 2015, 08:42 Keith C NgPrimary BeamlinesRepair1AT1 area water leak fixes1) Quick connect fittings on the rotary
collimator were leaking (the two red collared
fittings in photo below).
 11x 
  85   Friday, January 29, 2016, 17:08 Keith C NgPrimary BeamlinesMaintenance4VVR1 RemovalToday:
Disconnected and removed 4VVR1 gate
valve and removed from beamline.
  
  86   Friday, February 05, 2016, 08:48 Keith C NgPrimary BeamlinesMaintenance4VVR1 RemovalReturned work permit C2016-01-27-2 due
to tank lid being raised and elevated fields
make the work area un-favourable to work
  
  87   Thursday, February 18, 2016, 16:34 Keith C NgPrimary BeamlinesDevelopmentVault beam line 4V disassemblyDisconnected all 4V beamline joints. Parts
for indium joints removed except for the
Q1 to downstream monitor box and monitor
  
  88   Friday, February 19, 2016, 14:03 Keith C NgPrimary BeamlinesDevelopment4V CM1 blankingContinued with work blanking off CM1 flange.
- Placed lead shot on left and right
side of the CM1 flange to lower fields. No
 20160219_beamline4v_P1030499.JPG 
ELOG V2.9.2-2455