Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 73     Entry time: Thursday, February 26, 2015, 16:22
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: M13Q1Q2 blank off (part of UCN work) 

He leak checked T1M13Q1 joint, is leak tight.

 - Detected a small leak in nearby M15 slits box. 4.3x10E-9 atm cc/sec was highest leak rate recorded (Vac group says is small leak, okay to run).

 - Will be tearing down bridge setup and cover up area.

ELOG V2.9.2-2455