Message ID: 72     Entry time: Wednesday, February 25, 2015, 14:57
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: T1 M13Q1Q2 blank off work 

Blanking plate with indium between T1 and M13Q1 flange has been installed, joint will be He leak checked tomorrow. Vac group informs that pumping of T1 volume will start this afternoon going over night.

- The spring eyes on Q2 vacuum box are ~0.2" above the pin supports, the gap changes by 0.05" between open and closed positions.

- Pin drives were driven down to 34 turns (left a 1/8" gap between the bar and the top of the T1 flange)

20150225_vlcsnap00010.jpg

- A thermocouple wire was attached to the blanking plate, leads are not yet connected however.