Subject: M13Q1Q2 blank off (part of UCN work) 

"Hector" shield block installed into place, Q1Q2 Vacuum box still actuates normally. It does not appear that the position of the pin drive has shifted. Some additional shielding steel is to be placed on top of the shield block once RH setup is removed.

Remote handling equipment installed around T1 ready to install indium blanking plate between T1 and M13Q1.