  ID Date Author Category Type Subject Text Attachments
  90   Friday, March 04, 2016, 16:05 Keith C NgPrimary BeamlinesDevelopmentvault beamline 4 disassembly 
Attempted
to remove RH parts between Q1, 2 and monitor
  
  89   Monday, February 22, 2016, 16:09 Keith C NgPrimary BeamlinesDevelopment4V CM1 blanking 
Rolled
indium into new blanking plate turned down
 20160222_beamline4v_P1030502.JPG20160222_beamline4v_P1030511.JPG20160222_beamline4v_P1030505.JPG20160223_4VCM1_blank_off_inspection_report.pdf 
  88   Friday, February 19, 2016, 14:03 Keith C NgPrimary BeamlinesDevelopment4V CM1 blankingContinued with work blanking off CM1 flange.
- Placed lead shot on left and right
side of the CM1 flange to lower fields. No
 20160219_beamline4v_P1030499.JPG 
  87   Thursday, February 18, 2016, 16:34 Keith C NgPrimary BeamlinesDevelopmentVault beam line 4V disassemblyDisconnected all 4V beamline joints. Parts
for indium joints removed except for the
Q1 to downstream monitor box and monitor
  
  86   Friday, February 05, 2016, 08:48 Keith C NgPrimary BeamlinesMaintenance4VVR1 RemovalReturned work permit C2016-01-27-2 due
to tank lid being raised and elevated fields
make the work area un-favourable to work
  
  85   Friday, January 29, 2016, 17:08 Keith C NgPrimary BeamlinesMaintenance4VVR1 RemovalToday:
Disconnected and removed 4VVR1 gate
valve and removed from beamline.
  
  84   Friday, April 17, 2015, 15:11 Keith C NgM9Developmentm9 t2 alignment jobToday: Restored filler shielding in T2
M9 Q1Q2 hole.
- Blocks marked with beam direction
 6x 
  83   Thursday, April 16, 2015, 09:17 Keith C NgM9Developmentm9 t2 alignment jobYesterday (Apr 15):
1) Installed TB22265 on to M9 exit
port at 18:48 with no vacuum and left over
 9x 
  82   Tuesday, April 14, 2015, 08:31 Keith C NgM9Developmentm9 t2 alignment jobYesterday:
1) Addressed mounting issue with
the 15" alignment jig: removed material
 20150414_m9t2_P1030289.JPG20150414_m9t2_P1030290.JPG20150414_m9t2_P1030295.JPG20150414_m9t2_P1030297.JPG 
  81   Friday, April 10, 2015, 16:25 Keith C NgM9Developmentm9 t2 alignment jobContinued with installation of target jigs:
1) Craned in equipment for alignment
group.
  
  80   Thursday, April 09, 2015, 17:20 Keith C NgM9Developmentm9 t2 alignment job1) Vented T2 and removed rubber seal blanking
plate, vacuum level appeared to be at normal
operating ranges prior to the indium seal
 20150409_m9t2_P1030246.JPG20150409_m9t2_P1030251.JPG20150409_m9t2_P1030256.JPG20150409_m9t2_P1030248.JPG 
  79   Wednesday, April 08, 2015, 14:18 Keith C NgM9Developmentm9 t2 alignment job1) Visual inspection of T2 M9 flange: no
obvious indium deposits on T2 flange knife
edge seen, left over indium from before 2013
 12x 
  78   Tuesday, April 07, 2015, 16:09 Keith C NgM9Developmentm9 t2 alignment jobwork to prepare for installation of alignment
jigs on T2M9 and M9B1 continues:
1) Vented T2 volume and removed M9
  
  77   Tuesday, April 07, 2015, 08:27 Keith C NgM9Developmentm9 t2 alignment jobWork completed for Thursday:
1) Shielding filler blocks removed
from M9Q1Q2 hole. Highest field was 5mSv/h
 20150407_m9t2_P1030233.JPG 
  76   Wednesday, April 01, 2015, 16:07 Keith C NgM9MaintenanceT2 M9 area work1) Block and bridge setup is mostly complete
for T2 M9 sighting job. Waiting on approving
drawing TB22322 in order to continue with
  
  75   Monday, March 30, 2015, 16:10 Keith C NgM9RepairT2 area uncoveringStarted to uncover and create work space
around T2 M9 area, setup is mostly complete.
Some misc items to be craned into position.
  
  74   Thursday, March 05, 2015, 08:42 Keith C NgPrimary BeamlinesRepair1AT1 area water leak fixes1) Quick connect fittings on the rotary
collimator were leaking (the two red collared
fittings in photo below).
 11x 
  73   Thursday, February 26, 2015, 16:22 Keith C NgPrimary BeamlinesDevelopmentM13Q1Q2 blank off (part of UCN work)He leak checked T1M13Q1 joint, is leak
tight.
 - Detected a small leak in
  
  72   Wednesday, February 25, 2015, 14:57 Keith C NgPrimary BeamlinesDevelopmentT1 M13Q1Q2 blank off workBlanking plate with indium between T1 and
M13Q1 flange has been installed, joint will
be He leak checked tomorrow. Vac group informs
 20150225_vlcsnap00010.jpg 
  71   Monday, February 23, 2015, 15:57 Keith C NgPrimary BeamlinesDevelopmentM13Q1Q2 blank off (part of UCN work)"Hector" shield block installed
into place, Q1Q2 Vacuum box still actuates
normally. It does not appear that the position
  