90
|
Friday, March 04, 2016, 16:05 |
Keith C Ng | Primary Beamlines | Development | vault beamline 4 disassembly |
Attempted
to remove RH parts between Q1, 2 and monitor |
|
106
|
Thursday, July 27, 2017, 09:02 |
Keith C Ng | Primary Beamlines | Development | test | test |
|
34
|
Wednesday, February 06, 2013, 16:33 |
Keith C Ng | Primary Beamlines | Maintenance | t2 monolith measurements | Beam lines took measurements of top of
T2 using Leica Total Station. Required no
crane activities over 1A blocks. |
|
114
|
Friday, March 16, 2018, 13:39 |
Keith C Ng | M9 | Maintenance | t2 m9 port inspection | Video imaged T2 port post blank off removal,
looks roughly the same as last year. Knife
edge looks clean. |
|
117
|
Tuesday, March 27, 2018, 15:08 |
Keith C Ng | M9 | Standard Operation | t2 m9 port blank off | 1.
Blank off installed 11:40 with Dan McDonald,
east spring ear looks 'deeper" than |
|
118
|
Thursday, March 29, 2018, 15:15 |
Keith C Ng | M9 | Maintenance | t2 m9 port blank off | Today leak checked the M9 exit port with
Edi and we found no leaks. The usual delayed
helium response in the M20/Collimator B/ |
|
115
|
Wednesday, March 21, 2018, 15:22 |
Keith C Ng | M9 | Repair | t2 m9 laser tracker jigs | Installed the remaining laser tracker jigs
for beam lines. No issues. Made sure 8"
target the mounting poles did not interfere |
|
116
|
Monday, March 26, 2018, 15:57 |
Keith C Ng | M9 | Maintenance | t2 m9 laser tracker alignment | Removed all Leica tracker targets from
M9 pit, I will proceed with blanking off
T2 exit port sometime this week. Alignment |
|
103
|
Monday, February 20, 2017, 15:58 |
Keith C Ng | M9 | Development | t2 m9 job wrap up | Restored shielding to T2 M9 void, blocks
seem more crooked compared to previous years. |
|
97
|
Tuesday, February 07, 2017, 15:36 |
Keith C Ng | M9 | Development | t2 m9 job | - Removed blank off from t2 m9 port,
had to pry off with screw driver via spring
ears. Clean removal it seems. |
|
99
|
Friday, February 10, 2017, 15:53 |
Keith C Ng | M9 | Development | t2 m9 job | Installed all jigs and Alignment group
did their shoots successfully. Used individual
pins on the 15" target jig and worked |
|
101
|
Wednesday, February 15, 2017, 15:36 |
Keith C Ng | M9 | Development | t2 m9 blank off | Installed the blank off on the T2
M9 exit port: |
|
98
|
Thursday, February 09, 2017, 16:14 |
Keith C Ng | M9 | Development | t2 m9 alignment | Prepared m9 and b1 flanges for accepting
their target jigs. The target jigs need to
be reset by alignment group, 15" was |
|
109
|
Thursday, February 01, 2018, 15:44 |
Keith C Ng | Primary Beamlines | Repair | q15 repair | Correction that all supply side (even numbered
insulators) ceramic insulators on Q15 have
been replaced with new old stock insulators |
|
129
|
Friday, March 18, 2022, 12:12 |
Keith C Ng | Primary Beamlines | Repair | q15 repair | beamlines replaced leaking insulator
on q15, circuit #4. See updated pdf for replacement
part and location. |
|
8
|
Thursday, October 11, 2012, 16:40 |
Keith C Ng | M9 | Repair | m9 t2 joint repair | Today:
Bridge setup complete; Noticed 12
x 3 x 3 block when placed on top of several |
|
77
|
Tuesday, April 07, 2015, 08:27 |
Keith C Ng | M9 | Development | m9 t2 alignment job | Work completed for Thursday:
1) Shielding filler blocks removed
from M9Q1Q2 hole. Highest field was 5mSv/h |
|
78
|
Tuesday, April 07, 2015, 16:09 |
Keith C Ng | M9 | Development | m9 t2 alignment job | work to prepare for installation of alignment
jigs on T2M9 and M9B1 continues:
1) Vented T2 volume and removed M9 |
|
79
|
Wednesday, April 08, 2015, 14:18 |
Keith C Ng | M9 | Development | m9 t2 alignment job | 1) Visual inspection of T2 M9 flange: no
obvious indium deposits on T2 flange knife
edge seen, left over indium from before 2013 |
12x |
80
|
Thursday, April 09, 2015, 17:20 |
Keith C Ng | M9 | Development | m9 t2 alignment job | 1) Vented T2 and removed rubber seal blanking
plate, vacuum level appeared to be at normal
operating ranges prior to the indium seal |
|