  511   Monday, September 28, 2020, 09:36 John WongNb TARGET BOATDoneHeat Treatment of Nb for Edward


   
        
            
  
  512   Monday, September 28, 2020, 11:53 John Wongnp-SiC TARGET BOATIn progressnp-SiC carbonizationMonday, September 28, 2020, 11:49
6 discs of np-SiC were loaded to
the target boat wrapped with 3 layers of
  
  515   Friday, October 09, 2020, 09:50 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneTests, radiation gun for parasitic target 2020-10-09 9:48 The target was installed
the day before and left pumping over night.
IGP1=4.7e-7Torr. leak check when water on,
  
  516   Tuesday, October 13, 2020, 11:15 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDonefoil heating 2020-10-13 11:13 Target was left
under vacuum over the weekend. IGP1: 1.6e-7T
water on- leak check ok. Ramping up 2A/30s
  
  517   Thursday, October 15, 2020, 18:51 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneheat gun plus parasitic target thermal comissioning. 2020-10-15 18:51 : Setup installed
during the day. Pumped down to IGP1:1.5e-5T
, water leak check ok. Ramping up to 100A. 
  
  518   Friday, October 16, 2020, 16:31 Luca EgoritiEmpty TARGET BOATIn progressHPOG annealingFriday, October 16, 2020, 11:30
 Target mounted in EVAP2. Pump
down started
  
  520   Tuesday, October 27, 2020, 10:25 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneparasitic target commissioning 2020-10-27 10:24 setup introduced
yesterday. Pumping over night IGP1: 5.7e-7T.
Water leak check ok. Performing heating elements
  
  521   Monday, November 02, 2020, 18:32 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneHEA heat treatment2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok.
 20201104_102925.jpg20201104_144831.jpg 
  522   Wednesday, November 04, 2020, 17:31 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneParasitic target graphite outgassing. 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on.
  
  523   Thursday, November 05, 2020, 15:13 Ferran Boix PamiesEmpty41882-2TARGET BOATDonecleaning treatment. 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on.
  
  525   Tuesday, November 24, 2020, 12:56 Marla Cervantes 44139-8-SK TARGET BOATDoneGraphite casting conditioningTuesday, November 24, 2020, 09:23
A batch of 60 discs of 18 mm diameter
were loaded in a tantalum tube. The tantalum
 2020-11-24-IGP1.JPG2020-11-24IGP1-zoom_out.png2020-11-24-IGP1-stable.JPG2020-11-24-ConditioningProcess.JPG 
  526   Monday, February 01, 2021, 13:57 Darwin Ortiz RosalesSiC40282-4TARGET BOATDoneSintering of SiC discs for SEMMonday, February 01, 2021, 13:52  
  
  529   Saturday, February 13, 2021, 08:14 Darwin Ortiz RosalesSiC41992-1TARGET BOATDone Sintering of SiC discs for SEM Saturday, February 13, 2021, 08:10
Ta boat loaded with 80 discs
 Screenshot_2021-02-14_114713.png 
  536   Tuesday, March 16, 2021, 08:29 Darwin Ortiz RosalesTaC TARGET BOATDonesintering of TaC on Caps and springs Tuesday, March 16, 2021, 08:28 
Each endcap is separated with
  
  545   Sunday, April 04, 2021, 16:09 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneparasitic target commissioning 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking
  
  548   Thursday, April 15, 2021, 18:33 Marla CervantesTa44139-6-SKTARGET BOATDoneCarbon penetration on TaThursday, April 15, 2021, 18:24
Tantalum samples were loaded in a
tantalum testing tube and installed in the
 Ta-samples_heating.JPG 
  550   Friday, June 11, 2021, 08:41 Darwin Ortiz RosalesNb TARGET BOATDoneNb treatment for Norman Friday, June 11, 2021, 08:05
Target boat with a layer of
  
  552   Wednesday, July 21, 2021, 16:45 Ferran Boix PamiesEmpty TARGET BOATDoneparasitic target thermal tests v2, foil measurement. 2021-07-21 4:44pm Vacumm at 1e-5Torr.
Water cooling leak check ok.
  
  555   Wednesday, September 08, 2021, 12:43 Darwin Ortiz Rosales 44139-8-SKTARGET BOATDoneC Conditioning Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto
  
  558   Thursday, October 21, 2021, 09:58 Darwin Ortiz RosalesTaC TARGET BOATDoneCoating of Ta caps and Ta springs (10 caps and 2 springs) 
Thursday, October 21, 2021, 10:02
10 TaC coated Ta caps, wrapped in
  