Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 6 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  269   Friday, January 08, 2016, 11:15 Laura LambertTa41369-5HP-SISDoneTemperature measurements

    

       
            
  
  467   Thursday, November 21, 2019, 08:10 Aaron SchmidtSiC HP-FEBIADIn progressTemperature mapping. Thursday, November 21, 2019, 08:09:
PS on. Leak issue resolved (Evap 2 Elog 466).
Vacuum @ 4.10e-07T.
  
  474   Tuesday, December 03, 2019, 08:24 Aaron Schmidt  LP-FEBIADIn progressTemperature mapping.Tuesday, December 03, 2019, 08:15: Waterlines
opened. Vacuum ok @ 4.06e-07T
Tuesday, December 03, 2019, 08:23:
 TGHT_weird_behaviour.PNGIEVAP-WFB1.PNG191205-GHT-trip-1800.PNG 
  296   Wednesday, May 11, 2016, 17:24 John Wongnp-SiC TARGET BOATDoneTemperature Treament of Nanofiber SiC/PANWednesday, May 11, 2016, 17:15
Nanofiber SiC (~50nm grain size)/PAN
was prepared at UBC. 
  
  463   Tuesday, October 08, 2019, 14:16 Aaron SchmidtSiC HP-FEBIADIn progressTemp measurements.Tuesday, October 08, 2019, 14:14: Remove
Flex line HS. 
HS: 42752-1
  
  466   Friday, November 15, 2019, 13:26 Aaron SchmidtSiC HP-FEBIADProblems resolvedTemp map testing - 1. (Leak issue) HS 42752-5 - Setup for Temperature
mapping.
Friday, November 15, 2019, 13:26:
 Test_FEBIAD_2019_-_Nov_-_Leak.docxEvap_2_cooling_-_1.jpgTest_FEBIAD_Left_HS_cooling_line_-_1.jpgTest_FEBIAD_Left_HS_cooling_line_-_2.jpg 
  449   Monday, June 17, 2019, 17:09 Marla Cervantes 49044-9LP-SISDoneTarget container calibration/conditioning Monday, June 17, 2019, 17:04
A LP-SIS target container  was
wrapped with 3 heat shielding layers,
  
  425   Thursday, December 20, 2018, 10:27 Marla Cervantes 43630-6 DoneTantalum tube heatingThursday, December 20, 2018, 10:24
A tantalum tube was
  
  407   Saturday, April 28, 2018, 16:12 John WongEmptyTube container  DoneTaC coating/sintering of Tube containerSaturday, April 28, 2018, 16:09
Container is coated with TaC and
wrapped with TaC heatshield. 
  
  420   Thursday, October 25, 2018, 15:37 Marla CervantesTaC43044-7LP-SISDoneTaC coating/sintering for graphite insert test Thursday, October 25, 2018, 10:36
Container is coated with TaC
 181027-TaContainer-sintering.jpg 
  421   Wednesday, October 31, 2018, 19:35 Marla CervantesTaC39530-1LP-FEBIADDoneTaC coating/sintering for graphite insert test Wednesday, October 31, 2018, 19:35
Container is coated with TaC
 Capture.JPGCoating.jpg 
  423   Monday, November 19, 2018, 12:57 Marla CervantesEmpty43630-7 DoneTaC coating/sintering for graphite insert test Monday, November 19, 2018, 08:57
Tantalum tube was coated with
 TaC-coatingPlot.JPG 
  426   Wednesday, January 16, 2019, 11:53 Marla CervantesTaC43630-2 DoneTaC coating/sintering for graphite insert test Tuesday, January 15,
2018, 17:30
  
  436   Wednesday, April 03, 2019, 16:59 Marla CervantesTaC43630-5 DoneTaC coating/sintering for graphite insert test Wednesday, April 03, 2019, 16:57
Tantalum tube was coated with
  
  442   Friday, May 10, 2019, 16:58 Marla Cervantes 43943-1 DoneTaC coating/sintering for graphite insert test Friday, May 10, 2019, 16:54
A tantalum tube was coated with TaC,and
wrapped with three tantalum sheets,
  
  415   Wednesday, July 25, 2018, 17:33 John WongEmpty43044-2LP-SISDoneTaC coating/sintering for UCx#24Wednesday, July 25, 2018, 17:32
Container is coated with TaC and
wrapped with 3 layers of Ta heat-shields.
  
  418   Monday, September 10, 2018, 15:09 Marla CervantesEmpty42218-3LP-IG-LISDoneTaC coating/sintering for UC target container  Monday, September 10, 2018, 15:09
Container is coated with TaC
 EVAP2-_01.JPGHeater-ramp.jpgPlot_400A-230A.jpgTempeature-at-400A.jpgTaC-coating.png 
  417   Tuesday, September 04, 2018, 17:04 John WongEmpty LP-SISProblemsTaC coating/sintering for UC target containerTuesday, September 04, 2018, 16:58
Container is coated with TaC and
wrapped with Ta heat-shield ( 3 layers)
 TGHT-Current_error.JPG 
  427   Friday, January 18, 2019, 15:11 Darwin Ortiz RosalesEmpty43044-5LP-SISDoneTaC coating/sintering (training/online use) Friday, January 18, 2019, 15:00
Container was coated with TaC and
wrapped with 3 Ta heat shields.
  
  483   Sunday, May 24, 2020, 13:39 Marla CervantesEmpty44139-11LP-SISDoneTaC coating/sintering  Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC
 TaC-coating-sintering.PNG 
ELOG V2.9.2-2455