579
|
Wednesday, June 08, 2022, 10:00 |
Flora Wu | | boat | | Done | carbonize PAN 10% discs | Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun fiber pellets
Total weight = 208.3 g
container has 3 Ta heat shields.
Desired temperature at 1800 C
Omega slope set at 0.990
Good vac = 3.0e-5 Torr,
Bad vac = 5.0e-5 Torr.
Pumping down in progress
Thursday, June 09, 2022, 11:25
chamber pumped down below 5e-5
initiate auto ramping, 1A/min ----> 100 A
(see eLog 581)
|
|
578
|
Tuesday, June 07, 2022, 07:31 |
Darwin Ortiz Rosales | SiC | 42464-2 | HP-FEBIAD | Done | T-220524 Sintering SiC | Tuesday, June 07, 2022, 07:19
Total number of foils: 403 ( including 5 analysis discs on the right side of the container)
Total weight = 1535.3 g (includes heatshields, spring and T bar)
Total length packed 16.4 cm (excluding 5 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 50A at 3 A/min
then continue to 80A and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.6 e-07 Torr at start of initial ramp.
Tuesday, June 07, 2022, 11:14
Ramping to 150A on TGHT and TBHT at 1A/min
Ramped TGHT and TBHT to 230A at 2A/min
Tuesday, June 07, 2022, 13:12
Ramping TGHT to 600A at 4A/min
TBHT at 230A, 3.0V
Tuesday, June 07, 2022, 16:41
TGHT= 740 A, 12.1V
TBHT= 232A, 3.0 V
OMEGA reading 1616C but questionable. Will leave for 4 hours at 740A top TGHT.
Wednesday, June 08, 2022, 22:15
Early Wednesday morning the left TGHT bolt was found damaged. The target leg was coated with bolt material rendering the Target inoperable.
The Heatshield assembly was swapped and surfaces cleaned. A "dummy" FEBIAD was installed to test if the system can withstand high current.
The system was pumped down and ramped to 740A on TGHT at 4A/min. It was then left at that current for 4 to 5 hours.
Currently starting rampdown at -2A/min to 0A.
Photos of the incident attached in *eLog 580*. IGP1= 5.7e-06 Torr
TGHT= 742A, 11.4V |
|
577
|
Thursday, June 02, 2022, 16:53 |
Aaron Schmidt | Ta | 44691-12 | LP-SIS | In progress | Conditioning Ta#64 | Ta#64 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.0254mm (0.0010") Measured.
Target density = 12.005 g/cm3
Target length = 3.35 cm
Total Mass = 40.2166 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 446 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
End caps installed (Not expanded). No Ta foil heat shield added
Final desired temperature = 1900C.
Thursday, June 02, 2022, 16:49: Roughing
Thursday, June 02, 2022, 17:02: OMEGA slope = 0.98.
Thursday, June 02, 2022, 17:10: TP1 on.
Thursday, June 02, 2022, 17:21: TP1 is up to speed. PS on.
Friday, June 03, 2022, 05:22: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min. Vacuum @ 1.78e-06T.
Friday, June 03, 2022, 08:59: TGHT / TBHT @ 424 / 200 A. Vacuum @ 3.42e-06T. Temperature @ 1318 C. Auto ramp ongoing.
Friday, June 03, 2022, 09:40: TGHT / TBHT @ 500 / 200 A. Vacuum @ 4.47e-06T. Temperature @ 1469 C. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min
Friday, June 03, 2022, 10:47: TGHT / TBHT @ 580 / 230 A. Vacuum @ 6.26e-06T. Temperature @ 1620 C. Auto-ramping TGHT to 600 @ 2 A per min
Friday, June 03, 2022, 11:08: TGHT / TBHT @ 600 / 230 A. Vacuum @ 6.54e-06T. Temperature @ 1655 C. Auto-ramping TGHT to 630 @ 2 A per min
Friday, June 03, 2022, 11:30: TGHT / TBHT @ 630 / 230 A. Vacuum @ 7.73e-06T. Temperature @ 1708 C. Auto-ramping TGHT to 650 @ 2 A per min
Friday, June 03, 2022, 11:45: TGHT / TBHT @ 650 / 230 A. Vacuum @ 8.32e-06T. Temperature @ 1748 C. Auto-ramping TGHT to 660 @ 2 A per min
Friday, June 03, 2022, 11:53: TGHT / TBHT @ 660 / 230 A. Vacuum @ 8.83e-06T. Temperature @ 1755 C. Auto-ramping TGHT to 670 @ 2 A per min
Friday, June 03, 2022, 12:05: TGHT / TBHT @ 670 / 230 A. Vacuum @ 9.03e-06T. Temperature @ 1780 C. Auto-ramping TGHT to 680 @ 2 A per min
Friday, June 03, 2022, 12:11: TGHT / TBHT @ 680 / 230 A. Vacuum @ 9.14e-06T. Temperature @ 1795 C. Auto-ramping TGHT to 700 @ 2 A per min
Friday, June 03, 2022, 12:23: TGHT / TBHT @ 700 / 230 A. Vacuum @ 9.50e-06T. Temperature @ 1822 C. Auto-ramping TGHT to 720 @ 2 A per min
Friday, June 03, 2022, 12:29: TGHT / TBHT @ 720 / 230 A. Vacuum @ 1.00e-05T. Temperature @ 1853 C. Auto-ramping TGHT to 730 @ 2 A per min
Friday, June 03, 2022, 12:36: TGHT / TBHT @ 725 / 230 A. Vacuum @ 1.04e-05T. Temperature @ 1860 C. Manually tap up TGHT to reach desired temperature
Friday, June 03, 2022, 13:04: TGHT / TBHT @ 760 / 230 A. Vacuum @ 1.07e-05T. Temperature @ 1901 C. Desired temperature reached
Friday, June 03, 2022, 13:13: Auto-cooling at 2 A per min.
Monday, June 06, 2022, 07:07: PS off. BV1 closed & TP1 off.
Monday, June 06, 2022, 08:47: Venting. |
|
576
|
Wednesday, May 18, 2022, 09:59 |
Darwin Ortiz Rosales | SiC | 44692-9 | HP-FEBIAD | Done | T-220516 Sintering SiC | Wednesday, May 18, 2022, 09:46
Total number of foils: 415 ( including 10 analysis discs on the right side of the container)
Total weight = 1580 g (includes heatshields and T bar)
Total length packed 17 cm (including 10 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 30A at 3 A/min
then continue to and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.1 e-07 Torr at start of initial ramp. Note, first real operation with new noisy Turbo Pump.
Wednesday, May 18, 2022, 10:18
Pressure increase observed starting around 60A. Ramped to 70 A and will leave until pressure stabilizes
After about 30 minutes pressure dropped so ramped up to 90 A @1A/min on both TGHT and TBHT
Wednesday, May 18, 2022, 11:37
pressure spike around 90A. will leave until pressure stabilizes
Wednesday, May 18, 2022, 12:54
start autoramp to 100A at 1A/min. IGP1= 1.4e-4 Torr
Wednesday, May 18, 2022, 13:15
autoramp to 150A @1A/min
Wednesday, May 18, 2022, 13:41
At 110A another spike in pressure. System waiting for good vacuum
Wednesday, May 18, 2022, 15:24
ramped to 150A on both TGHT and TBHT. Ramping to 200 A at @A/min for both TGHT and TBHT
currently IGP1= 2.0e-4 Torr
Wednesday, May 18, 2022, 15:33
Pressure still trending down; therefore will start ramp at 4A/min to 400 amp on TGHT and 230A to TBHT
Wednesday, May 18, 2022, 16:22
Increasing ramp to 4A/min on TGHT
Wednesday, May 18, 2022, 17:26
switched to 6A/min in 1A/10s increments on TGHT
Wednesday, May 18, 2022, 17:43
Set final current to 730 A as per regression attached.
Wednesday, May 18, 2022, 17:54
Final current on TGHT = 740A, 11.9 V
OMEGA = 1775 C
TBHT = 230A,
Will leave for 4 hours
Wednesday, May 18, 2022, 19:56
Temperature dropped so increased current to 755A for the remaining of the time.
Friday, May 20, 2022, 08:58
Final notes: The difference between initial and final mass was 6 g as expected. Slight coating on window of evaporator may explain apparent temperature drop. Next time will keep current at projected setting. The material looks good with slight overheating on the outer discs of left side.
|
|
575
|
Tuesday, May 10, 2022, 14:43 |
Aaron Schmidt | | | | Maintenance | Active TP removed / Swap / Slow start TP | Tuesday, May 10, 2022, 14:42: TV551 Varian. SN: 202311 (Slightly active from BL1A - will not cross contaminate. Field only - Tagged) was removed as it was meant to be a temporary fix. Replacement (Refurbished) pump is to be installed. (Tomorrow - Use slow start function as per vacuum group)
Thursday, May 12, 2022, 13:30: Agilent TP & hardware installed.
SN: IT21381010
Thursday, May 12, 2022, 13:41: Roughing.
Thursday, May 12, 2022, 13:46: Halt.
Friday, May 13, 2022, 07:05: Roughing.
Friday, May 13, 2022, 07:18: TP1 on.
Friday, May 13, 2022, 07:23: Up to 14 KRPM. Pause/Halted startup (Whining?). Slow start w/ vacuum group.
Process to perform a TP slow start:
- Hold both top buttons on the controller for about 3 seconds
- Right Yes/No left to continue.
- Advance to soft start - 20 min.
- Back to remote start & go.
Friday, May 13, 2022, 08:26: TP1 on w/ slow start.
Friday, May 13, 2022, 08:39: 13 KRPM & climbing.
Friday, May 13, 2022, 09:10: TP at full speed. 38 KRPM. 0.5A 9w. This pump whines, but is operating fine. Likely will switch again when another is available. (It appears to have been dropped, Noted by Edi. Likely when shipped)
Friday, May 13, 2022, 09:14: TP off. Slow start function off. Back to normal function. |
|
574
|
Monday, April 25, 2022, 08:31 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK sample test 2 | Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T . Ramping up 1A/10s to 500A.
Monday, April 25, 2022, 10:05 500A reached, waiting 1h. TC at 50degC
Monday, April 25, 2022, 10:59 TC at 58degC. Ramping down 1A/10s to 0 A.
Monday, April 25, 2022, 13:37 TGHT at 0A , venting system. |
|
573
|
Thursday, April 21, 2022, 09:45 |
Darwin Ortiz Rosales | TaC | 42218-2 | LP-IG-LIS | Done | TaC coating | Thursday, April 21, 2022, 09:43
TaC coated Target container was placed in Evaporator 2 yesterday and left pressuring down.
Ta Heatshields: 3
Target temperature on OMEGA = 1800-1850 C
OMEGA slope: 0.990
Target time at temperature = 4 hours
Target final TBHT current: 230A
Approximate final TGHT current: 420A (will adjust manually)
Heating autoramp started @ ~2A/min on both TGHT and TBHT
initial IGP1 = 9.3e-7 Torr
Thursday, April 21, 2022, 10:38
Pressure trending down after peak. Start autoramp at 1A/min to 50A on both TGHT and TBHT.
Thursday, April 21, 2022, 10:56
Pressure continues to decrease. Will ramp up faster @4A/min to 90A for both TGHT and TBHT.
Thursday, April 21, 2022, 11:07
Second peak has begun to form . Will keep at 90A awaiting stabilization
Thursday, April 21, 2022, 11:35
pressure stable. Continue to autoramp at 1A/min and if pressure stable increase ramp to 4A/min
Thursday, April 21, 2022, 11:49
small peak observed and stabilizing. Autoramp @ 6A/min to 400A on TGHT and to 230A on TBHT
Thursday, April 21, 2022, 12:35
Regression plot . 1800C should be reached ~1800C.
Thursday, April 21, 2022, 12:44
Target current reached.
OMEGA = 1762 C
Will manually bump current to 415 A
OMEGA = 1802 @ 415 A @ 12:51 pm
Thursday, April 21, 2022, 16:50
OMEGA=1823 C
IGP1= 2.9e-06 Torr
TGHT= 417 A, 7.2 V
TBHT= 232A, 3.0V
Rampdown will start at -2A/min for both TGHT and -1A/min TBHT
|
|
572
|
Sunday, April 17, 2022, 10:37 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK samples heat test | Thursday, April 14, 2022, 10:36 Setup, PEEK samples installed on heatshield with TC. Pump down over the weekend.
Sunday, April 17, 2022, 10:37 Vacuum 3e-7T, ramp up TGHT 1A/10s to 500A
Sunday, April 17, 2022, 12:00 500A reached, waiting 1hour. TC at 42degC.
Sunday, April 17, 2022, 12:57 after 1h, TC at 45degC. Ramping down 1A/10s. Vacuum 2.7e-6Torr.
Sunday, April 17, 2022, 14:33 ramped down to 0A. Turning off turbo and venting. |
|
571
|
Tuesday, April 12, 2022, 13:41 |
Aaron Schmidt | | | | Maintenance | New Flex - line HS installed | Old HS sprang a leak in the copper tubing.
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing.
Tuesday, April 12, 2022, 13:49: TP1 switched on.
Tuesday, April 12, 2022, 13:57: TP1 stable (green).
Tuesday, April 12, 2022, 14:10: Vacuum @ 3.71e-05T & dropping.
Tuesday, April 12, 2022, 14:11: HS waterline opened.
Tuesday, April 12, 2022, 14:12: Vacuum @ 3.32e-05T.
Tuesday, April 12, 2022, 14:22: Vacuum @ 2.19e-05T (Stable).
|
|
570
|
Wednesday, March 23, 2022, 10:52 |
Darwin Ortiz Rosales | TaC | 44692-9 | HP-FEBIAD | Done | TaC coating | Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3.5 layers) (two pieces around the fins only and 3 layers around the whole )
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max). TGHT expected to reach desired Temperature @~700A
Evap 2 was pumped down over previous night
Good vacuum = 3.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @0.5 A/min to 60 A
Wednesday, March 23, 2022, 11:37
Increase autoramp to 1A/min to 60A for both TGHT and TBHT
Wednesday, March 23, 2022, 12:24
Pressure increasing at 60A so will leave at this current until pressure drops
Wednesday, March 23, 2022, 13:32
IGP1 = 2.9e-06 Torr
Will autoramp at 0.5A/min to 90A both TGHT and TBHT
Thursday, March 24, 2022, 16:35
1800C reached at 724A TGHT . TBHT @ 230A. Will keep at this temperature for 4 hours.
Thursday, March 24, 2022, 20:20
IGP1 = 6.9 e-06 Torr
OMEGA= 1828 C
TGHT = 724 A, 11.6 V
TBHT = 232.8 A, 3.1 V
Will start ramp-down at 2035 @ -2A/min TGHT and -1A/min TBHT
|
Attachment 1: image_2022-03-24_201954.png
|
|
|
569
|
Wednesday, March 09, 2022, 06:27 |
Darwin Ortiz Rosales | TaC | 42464-2 | HP-FEBIAD | Done | TaC coating/sintering | Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over previous night
Good vacuum = 3.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @1A/min to 60 A
Wednesday, March 09, 2022, 09:29
TGHT= 60 A 0.67 V
TBHT = 60A 0.59V
IGP1= 1.77e-6 Torr
autoramp @ 2A/min to 120 A and monitor (both TGHT and TBHT)
Wednesday, March 09, 2022, 10:19
IGP1 was increasing to fast. Manually lowered current to 105A on both TGHT and TBHT.
Will allow pressure to stabilize
Plant group requested maintenance work for EF12/13
Therefore, keeping system as is until further instructions from plant group.
Thursday, March 10, 2022, 15:18
Will resume ramp up to 120 A for both TGHT and TBHT @ 1A/min
IGP1= 6.4 e-07 Torr
Thursday, March 10, 2022, 15:30
Increase ramp rate to 2A/min
Thursday, March 10, 2022, 17:41
@ 245 A TGHT and 230A TBHT ramp back down to 100 A for both as OMEGA not displaying Temperature. Will need to go in tomorrow to fix OMEGA
Friday, March 11, 2022, 14:25
Ramping at 2A/min to 230A for both TGHT and TBHT
Friday, March 11, 2022, 15:17
IGP1= 1.23e-6 Torr
Continue Ramping TGHT @ 3A/min to 400 A keep TBHT at 230A
Friday, March 11, 2022, 22:22
@ TGHT 725 A 1800 C was reached on OMEGA
Kept there since 7:20 pm. Start rampdown at 11:20 pm.
Friday, March 11, 2022, 23:19
IGP1= 6.9e-6 Torr
OMEGA= 1805C
TGHT= 725 A, 10.9V
TBHT= 232A, 3.1V
Start rampdown at -2A/min on TGHT and -1A/min for TBHT
|
|
568
|
Tuesday, February 15, 2022, 12:37 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of niobium foil on the bottom used to heat up Nb samples to 1400 C for 4 hrs.
OMEGA slope = 0.99
The niobium samples are wrapped in a layer of Nb foil.
Boat is wrapped with 2 layers of Nb foil.
Good vacuum 3.00e-02 Torr
Bad vacuum 5.00e-02 Torr
Autoramping TGHT at 2A/min to 200A, then monitor until desired temperature
Initial IGP1=6.0e-06 Torr
Tuesday, February 15, 2022, 12:44
Increasing ramp up to 3A/min to 220 A as pressure very stable
Tuesday, February 15, 2022, 14:04
ramped up manually to 1400C
IGP1 =3.9 e-06 Torr
TGHT = 340A, 5.5V
OMEGA = 1400 C
Tuesday, February 15, 2022, 14:21
Temperature on OMEGA up to 1413 C
Lowering current to 332A , OMEGA = 1400 +/- 5C
Wednesday, February 16, 2022, 11:43
On Tuesday February15, 2020 @18:04 started ramp down @-3A/min
|
|
567
|
Thursday, February 10, 2022, 08:58 |
Darwin Ortiz Rosales | SiC | | HP-FEBIAD | Done | | Thursday, February 10, 2022, 08:52
Total number of foils: 528 ( including 10 analysis discs)
Weight without springs = 1521.9 g (includes heatshields and T bar)
Total length packed 18.1 cm (including 10 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at ends
Initially to ramp TGHT and TBHT to 50A at0.5 A/min
Then heat automatically heat to OMEGA ~1400 C , then continue to max 530A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 1.0 e-06 Torr at start of initial ramp
IGP1 = 5.7 e-06 Torr
TGHT = 50.0 A, 0.6 V
TBHT = 50.0A, 0.5 V
continue to ramp up at 0.5A/min to 200A
Friday, February 11, 2022, 07:59
IGP1=3.0e-07 Torr and stable
TGHT= 201A, 2.8V
TBHT = 201A, 2.6V
continue autoramp at 1A/min to 230A on TBHT and 450A on TGHT
Friday, February 11, 2022, 12:41
IGP1= 6.6e-05 Torr
TGHT= 450A, 6.5V
TBHT= 232A, 3.1V
OMEGA = 1258C
Allowing pressure to drop. Will continue ramp up when [pressure around 9-e-6 Torr
Friday, February 11, 2022, 13:59
IGP1= 2.4e-05 Torr
Will ramp up at 1A/min to 550A on TGHT
Friday, February 11, 2022, 15:54
IGP1= 2.4e-05 Torr
TGHT= 551.0A, 8.3V
TBHT=232A, 3.2V
OMEGA= 1426 C
ramp to 600 A @ 2A/min
Friday, February 11, 2022, 16:23
TGHT= 600.1A, 9.3V
TBHT= 232A, 3.2V
OMEGA = 1612C
ramp to 689 @2A/min to 1800 C as projected in regression plot attached
Friday, February 11, 2022, 21:20
Evap has been at 1800 +/- 20 C for 4 hours and 10 minutes
OMEGA 1802 C
TGHT = 689 A, 11.0V
TBHT=232.8 A, 3.26V
IGP1= 1.3e-05 Torr and stabilizing.
will start cool down at -2A/min TGHT and -1A/min TBHT
|
|
566
|
Wednesday, February 09, 2022, 08:08 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of niobium foil on the bottom used to heat up Nb samples to 1100 C for 4 hrs.
OMEGA slope = 0.99
The niobium samples are wrapped in a layer of Nb foil.
Boat is wrapped with 2 layers of Nb foil.
Good vacuum 3.00e-02 Torr
Bad vacuum 5.00e-02 Torr
Autoramping TGHT at 3A/min to 180A, then monitor until desired temperature (based on eLog 550)
Initial IGP1=9.9e-07 Torr
Wednesday, February 09, 2022, 08:00
TGHT = 225 A, 3.2V
IGP1= 1.17e-06 Torr
OMEGA= 1100C +/- 12C fluctuations
Wednesday, February 09, 2022, 11:55
TGHT= 225 A, 3.3 V
IGP1= 9.7e-07 Torr
OMEGA=1100C +/- 10C fluctuations
Wednesday, February 09, 2022, 11:56
Start cooling @-2A/min |
|
565
|
Thursday, November 25, 2021, 14:00 |
Aaron Schmidt | | | | | Lower insulator replaced | The Helicoil had mostly pulled out of the old one.
Thursday, November 25, 2021, 13:58: Insulator replaced. EVAP 2 is ready for use with ISAC targets. |
|
564
|
Wednesday, November 10, 2021, 18:07 |
Aaron Schmidt | Ta | 44691-11 | LP-SIS | In progress | Conditioning Ta#63 | Ta#63 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 15.38 g/cm3
Target length = 3.4 cm
Total Mass = 52.296 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 457 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
End caps installed (Not expanded). No Ta foil heat shield added
https://elog.triumf.ca/TIS/Target+Production/114
TBHT will be ramped up to 230A
TGHT will be ramped up to 600A +
Final desired temperature = 1900C.
OMEGA slope = 0.98.
Wednesday, November 10, 2021, 18:05: Roughing.
Wednesday, November 10, 2021, 18:14: Omega Laser set. On end cap / ok. Slope = 0.980
Wednesday, November 10, 2021, 18:24: Turbo pump on.
Wednesday, November 10, 2021, 18:25: RV1 valve hissing. Stop TP. Reset, open / close RV1 multiple times. Hissing stopped on its own. Won't affect the pump down, letting pressure out, not in. Will need to replace later.
Wednesday, November 10, 2021, 18:27: Turbo pump on.
Wednesday, November 10, 2021, 18:32: TP ok. PS on.
Thursday, November 11, 2021, 11:08: Vacuum @ 4.56e-07T. Auto ramping TGHT / TBHT to 580 / 230 A @ 2A per minute.
Thursday, November 11, 2021, 13:49: TGHT / TBHT @ 313 / 230 A. Vacuum @ 1.46e-06T. Temperature @ 1051 C. Auto ramp continues.
Thursday, November 11, 2021, 16:55: TGHT / TBHT @ 580 / 230 A. Vacuum @ 5.11e-06T. Temperature @ 1621 C. Auto ramp TGHT to 610 A @ 2 A per min.
Thursday, November 11, 2021, 17:13: TGHT / TBHT @ 610 / 230 A. Vacuum @ 6.54e-06T. Temperature @ 1670 C. Auto ramp TGHT to 630 A @ 2 A per min.
Thursday, November 11, 2021, 17:32: TGHT / TBHT @ 630 / 230 A. Vacuum @ 7.82e-06T. Temperature @ 1709 C. Auto ramp TGHT to 650 A @ 2 A per min.
Thursday, November 11, 2021, 18:49: TGHT / TBHT @ 650 / 230 A. Vacuum @ 7.40e-06T. Temperature @ 1758 C. Auto ramp TGHT to 665 A @ 2 A per min.
Thursday, November 11, 2021, 19:02: TGHT / TBHT @ 665 / 230 A. Vacuum @ 8.37e-06T. Temperature @ 1790 C. Auto ramp TGHT to 685 A @ 2 A per min.
Thursday, November 11, 2021, 19:22: TGHT / TBHT @ 685 / 230 A. Vacuum @ 9.56e-06T. Temperature @ 1830 C. Auto ramp TGHT to 700 A @ 2 A per min.
Thursday, November 11, 2021, 19:41: TGHT / TBHT @ 700 / 230 A. Vacuum @ 1.18e-05T. Temperature @ 1870 C. Manually tap up to 705 A
Thursday, November 11, 2021, 19:43: TGHT / TBHT @ 705 / 230 A. Vacuum @ 1.25e-05T. Temperature @ 1885 C. Manually tap up to 710 A
Thursday, November 11, 2021, 19:44: TGHT / TBHT @ 710 / 230 A. Vacuum @ 1.34e-05T. Temperature @ 1890 C. Manually tap up to 715 A
Thursday, November 11, 2021, 19:46: TGHT / TBHT @ 715 / 230 A. Vacuum @ 1.75e-05T. Temperature @ 1898 C. Manually tap up to 717 A
Thursday, November 11, 2021, 19:46: TGHT @ 717 A. Temperature @ 1901 C. Temperature reached.
Thursday, November 11, 2021, 19:48: Begin auto-cooling @ 2 A per min.
Friday, November 12, 2021, 06:13: PS off. TP1 off. |
|
563
|
Monday, November 08, 2021, 09:36 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | Coating of Ta caps and Ta springs (8 caps and 2 springs) | Monday, November 08, 2021, 09:35
Two groups of 4 caps wrapped in graphite with graphite discs in between.
Two TaC coated springs at either end of the boat.
Target temperature = 1800 C
Expected around 430 TGHT
Good Vacuum 3e-03 Torr
Bad Vacuum 5e-02 Torr
Evap two was left pressuring down over weekend.
Monday, November 08, 2021, 09:35
Starting autoramp to 40 A at 1A/min
TGHT = 2.5e-07 Torr
Monday, November 08, 2021, 10:57
IGP1 = 8.5e -06 Torr and dropping
set autoramp to 50A at 1A/min
IGP1 1.0e-05 Torr and dropping
Set TGHT to autoramp to 90 A @ 1A/min and leave until pressure below 9e-06 Torr
Monday, November 08, 2021, 15:09
IGP1= 9.6e-06 Torr
Start autoramp to 400A at 2A/min
Monday, November 08, 2021, 17:37
TGHT = 377 A, 6.1V
OMEGA= 1234 C
Monday, November 08, 2021, 17:58
OMEGA = 1292 (cannot trust )
400A, 6.3 V
1.4 e-05 Torr
Autoramp @ 1A/min to 425A
Will heat to 425A and keep there for four hours
Monday, November 08, 2021, 22:02
TGHT=420A, 6.7V
IGP1= 7.0e-06 Torr
Start ramp down at -2A/min
|
|
562
|
Wednesday, November 03, 2021, 09:24 |
Darwin Ortiz Rosales | Empty | 44691-10 | LP-SIS | Done | TaC coating/sintering | Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Note: placed tantalum foil heatshield on both sides of the copper heatshield assembly.
Desired temperature = 1800 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down yesterday
Good vacuum = 3.00 e-03Torr
Bad vacuum = 5.00 e-02 Torr
Wednesday, November 03, 2021, 09:27
Start autoramp at 1A/min to 40A on both TGHT and TBHT
IGP1 initial: 5.3 e-07 Torr
Wednesday, November 03, 2021, 10:22
IGP1= 1.1 e-05 Torr
TGHT = 40 A, 0.5 V
TBHT= 38.5 A, 0.41 V
Will keep while monitoring pressure at 0.5 A/min to 60A
Wednesday, November 03, 2021, 10:35
IGP1 pressure trending down
IGP1= 6.7 e-06 Torr
Start ramp up to 60A at 0.5A/min
Wednesday, November 03, 2021, 11:24
IGP1 2.6 e-06 Torr and trending down
Start ramp up to 400A on TGHT and 230A on TBHT at 1A/min
Wednesday, November 03, 2021, 13:28
IGP1= 1.4e-05 Torr and trending down slowly. Will increase ramp speed to 1.5A/min on both TGHT and TBHT to the same final current as before.
Wednesday, November 03, 2021, 15:56
IGP1= 2.1 e-05 Torr
TGHT = 400 A, 6.9 V
TBHT = 233 A, 4.1 V
OMEGA = 1645 C
Will manually ramp up to 1800 C
Wednesday, November 03, 2021, 16:43
TGHT = 450 A, 7.9 V
TBHT = 233 A, 4.1 V
OMEGA = 1770 C
IGP1 increasing in Pressure. Will leave for 4 hours at this current.
Wednesday, November 03, 2021, 20:48
IGP1= 1.0 e-05 Torr
TBHT= 233A, 4.1 V
TGHT = 450 A, 7.9 V
OMEGA = 1751 C
Starting ramp down at -2A/min on TGHT and -1A/min on TBHT
|
|
561
|
Monday, November 01, 2021, 07:39 |
Darwin Ortiz Rosales | Empty | 44508-3 | LP-SIS | Done | TaC coating/sintering | Monday, November 01, 2021, 07:37
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Note* on the leading end of the assembly I placed tantalum foil heatshield similar to what I previously observed there. I believe it may impact temperature at the entrance of the container tube.
Desired temperature = 1800 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down over the weekend
Good vacuum = 3.00 e-03Torr
Bad vacuum = 5.00 e-02 Torr
Monday, November 01, 2021, 07:39
Starting autoramp at 1 A/min to 40 A on both TGHT and TBHT
IGP1= 3.5 e-07 Torr
Monday, November 01, 2021, 09:08
IGP1= 1.6 e-06 Torr
TGHT = 40A, 0.99 V
TBHT = 39A, 1,2 V
Start autoramp @ 1A/min for both TGHT and TBHT to 400A and 230A respectively.
Monday, November 01, 2021, 14:33
OMEGA= 1545 C
TGHT = 354 A, 6.0 V
TBHT = 233 A, 4.8 V
IGP1= 1.7 e-05 Torr
increase ramp rate to 2A/min
Monday, November 01, 2021, 14:44
OMEGA= 1585C
TGHT = 367A, 6.3 V
TBHT = 233 A, 4.8 V
IGP1= 1.7 e-05 Torr
Monday, November 01, 2021, 14:49
OMEGA= 1604 C
TGHT = 377A, 6.5V
TBHT = 233 A, 4.8 V
IGP1= 2.1 e-05 Torr
Monday, November 01, 2021, 14:53
OMEGA= 1624C
TGHT = 384 A, 6.6V
TBHT = 233 A, 4.8 V
Monday, November 01, 2021, 15:00
OMEGA= 1660C
TGHT = 400 A, 6.8V
TBHT = 233 A, 4.8 V
IGP1= 2.4 e-05 Torr
Monday, November 01, 2021, 15:17
Initiate autoramp to 430A on TGHT @2A/min
Monday, November 01, 2021, 16:34
OMEGA = 1750 C
TGHT = 430 A, 7.3 V
Better heat insulation than before. Next time need to place a Ta heatshield at the other end on the copper assembly. Will raise T to 435 A and keep until 1930 hours.
Monday, November 01, 2021, 20:23
IGP1= 1.6 e-05 Torr
Omega = 1760 C
TGHT= 436 A, 7.4 V
TBHT = 232 A, 4.8 V
* Note: kept a approx 1 hour extra hoping that pressure would drop further
Started ramp down at -2A/min for TGHT and -1A/min for TBHT
Coating looks reasonably good.
|
Attachment 1: 211101-TaC_coating.png
|
|
|
560
|
Wednesday, October 27, 2021, 11:09 |
Darwin Ortiz Rosales | Ta | 44691-3 | LP-SIS | Done | TaC coating/sintering | Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52
Ta LPSIS tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over previous night
Good vacuum = 3.00 e-3 Torr
Bad vacuum = 5.00 e-2 Torr
Initial total weight = 464.8 g
Final weight after sintering =
Thursday, October 28, 2021, 07:46
IGP1= 7.4e-07 Torr
Initiating autoramp to 40 A on both TGHT and TBHT
ramp rate = 1 A/min
Will keep at 40A for approximately 1 hour or until pressure below 1e-05 Torr
Thursday, October 28, 2021, 09:41
IGP1= 1.9e-06 Torr TGHT = 40.3 A, 0.48 V TBHT = 39.0 A, 0.48V
Autoramp @ 1A/min to 100A on both TGHT and TBHT
Thursday, October 28, 2021, 12:57
IGP1= 1.1e-06 Torr
TGHT = 100 A, 1.3 V
TBHT = 100 A, 1.2 V
Start autoramp at 2A/min to 400 for TGHT and 230 for TBHT
The current from the plot (below) required to reach 1900 C seems too high.
Will take to 430 A as previous. The slope was chequed previously. Need to check OMEGA.
Thursday, October 28, 2021, 20:08
IGP1= 3.34 e-06 Torr
TGHT = 430A , 7.2 V
TBHT = 233A, 4.1V
OMEGA = 1628C
Start ramp down at -2A/min for TGHT and -1A/min for TBHT
|
44691-3 TaC coating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TGHT |
|
TBHT |
|
|
Temperature (C) |
Current (A) |
|
|
|
|
|
|
|
|
|
|
|
|
Temperature ( C ) |
Voltage (V) |
Current (A) |
Voltage (V) |
Current (A) |
|
1900 |
512.88 |
|
|
|
|
|
|
|
|
|
|
|
|
1250 |
3.90 |
255.0 |
|
|
|
1700 |
434.06 |
|
|
|
|
|
|
|
|
|
|
|
|
1302 |
4.30 |
279.0 |
|
|
|
1800 |
473.47 |
|
|
|
|
|
|
|
|
|
|
|
|
1343 |
4.60 |
294.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1423 |
5.10 |
325.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1484 |
5.7 |
348.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1555 |
6.2 |
377.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Slope |
2.537 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Y intercept |
598.66 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
R2 |
0.999 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|